You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan 1700 Titik Jalan Lingkungan di Jaktim Terus Dikebut

Local Road Repair in E. Jakarta Accelerated

East Jakarta Bina Marga Sub-dept. repairs damaged local roads. Its repair is hoped to complete by the end of this year.

Road length and wide are various, depending on citizen proposal in last musrenbang

"Road length and wide are various, depending on citizen proposal in last musrenbang," said Juaini Yusuf, Head of East Jakarta Bina marga Sub-dept., Thursday (11/2).

According to him, first phase of road repair was held from May to October in 1,300 points. In second phase, only 400 points remaining that needs to be repaired.

Council Wants Neighborhood Road Repair Accelerated

"For this second phase, 400 points need to be repaired since half of the contract has been signed," he closed.

 

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5481 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4618 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1825 personTiyo Surya Sakti
  4. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye1032 personAldi Geri Lumban Tobing
  5. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye1021 personFakhrizal Fakhri