You don't have javascript enabled. Good luck with that.
Pencarian
 SDA Jakut Bangun 3 Crossing di Jl Kapuk Raya
.
photo Nurito - Beritajakarta.id

Three Waterways Built on Jl. Kapuk Raya

North Jakarta Water Resources (SDA) Sub-dept. builds three waterways on Jalan Kapuk Raya, Kapuk Kamal Urban Village, Penjaringan to prevent inundation.

We build three waterways at once to avoid inundation on Jalan Kapuk Raya

North Jakarta SDA Sub-dept. Head, Santo said, those waterways have 9 meters, 12 meters, and 16 meters long. While for its construction will use concrete from manufacturer with 1 meter diameter.

"We build three waterways at once to avoid inundation on Jalan Kapuk Raya. We also dredge PHB channel on Jalan Kapuk Raya," he said, Friday (11/3).

11 Waterways Alerted at Flood-Prone Spots in North Jakarta

PHB channel dredging is done from Vooglar to ring road or near Cengkareng Drain River. Along these four kilometers, channel is dredged using three heavy equipment.

"It is targeted it to finish by the end of this November. It needs to be dredged since it is full of trash," he closed. 

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye395 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye352 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye324 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye316 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik