You don't have javascript enabled. Good luck with that.
Pencarian
 SDA Jakut Bangun 3 Crossing di Jl Kapuk Raya

Three Waterways Built on Jl. Kapuk Raya

North Jakarta Water Resources (SDA) Sub-dept. builds three waterways on Jalan Kapuk Raya, Kapuk Kamal Urban Village, Penjaringan to prevent inundation.

We build three waterways at once to avoid inundation on Jalan Kapuk Raya

North Jakarta SDA Sub-dept. Head, Santo said, those waterways have 9 meters, 12 meters, and 16 meters long. While for its construction will use concrete from manufacturer with 1 meter diameter.

"We build three waterways at once to avoid inundation on Jalan Kapuk Raya. We also dredge PHB channel on Jalan Kapuk Raya," he said, Friday (11/3).

11 Waterways Alerted at Flood-Prone Spots in North Jakarta

PHB channel dredging is done from Vooglar to ring road or near Cengkareng Drain River. Along these four kilometers, channel is dredged using three heavy equipment.

"It is targeted it to finish by the end of this November. It needs to be dredged since it is full of trash," he closed. 

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1127 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye290 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye288 personAldi Geri Lumban Tobing