You don't have javascript enabled. Good luck with that.
Pencarian
 SDA Jakut Bangun 3 Crossing di Jl Kapuk Raya

Three Waterways Built on Jl. Kapuk Raya

North Jakarta Water Resources (SDA) Sub-dept. builds three waterways on Jalan Kapuk Raya, Kapuk Kamal Urban Village, Penjaringan to prevent inundation.

We build three waterways at once to avoid inundation on Jalan Kapuk Raya

North Jakarta SDA Sub-dept. Head, Santo said, those waterways have 9 meters, 12 meters, and 16 meters long. While for its construction will use concrete from manufacturer with 1 meter diameter.

"We build three waterways at once to avoid inundation on Jalan Kapuk Raya. We also dredge PHB channel on Jalan Kapuk Raya," he said, Friday (11/3).

11 Waterways Alerted at Flood-Prone Spots in North Jakarta

PHB channel dredging is done from Vooglar to ring road or near Cengkareng Drain River. Along these four kilometers, channel is dredged using three heavy equipment.

"It is targeted it to finish by the end of this November. It needs to be dredged since it is full of trash," he closed. 

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1053 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye989 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye946 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye721 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye619 personAnita Karyati