You don't have javascript enabled. Good luck with that.
Pencarian
Rusun Rorotan dan Nagrak Dialiri Listrik 8 MVA

Rorotan RPH Construction Reaches 95 Percent

Rorotan Slaughterhouse (RPH), Cilincing, North Jakarta, construction has reached 95 percent. It is targeted to complete on December 20 ahead.

This will be used to accommodate poultry traders in Marunda

"We hope construction to complete soon thus relocation can be accelerated. This will be used to accommodate poultry traders in Marunda," said Husein Murad, North Jakarta Mayor, when surveying the location, Wednesday (12/13).

RPH is built above 4,557 square meters land. It will be built 34 poultry shelters with 9 square meters each. It is considered to accommodate 200 chickens.

PD Dharma Jaya Ensures to Sell Quality Meat

Besides, there will be four manual abattoir and semi-auto abattoir. This building will be also equipped with food court, toilet, and office.

Meanwhile, Jakarta Maritime Agriculture and Food Tenacity (KPKP) Dept.'s Poultry and Animal Health Division Head, Sri Hartati informed, its inauguration is planned in January 2018 and it is start to operate in February.

"Rorotan RPH construction has reached 95 percent with budget around Rp 10.7 billion," she added.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1499 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1414 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1282 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1079 personNurito
  5. Jakarta KPU Records More Than 8.2 Million Registered Voters

    access_time06-07-2026 remove_red_eye1010 personFolmer