You don't have javascript enabled. Good luck with that.
Pencarian
Rusun Rorotan dan Nagrak Dialiri Listrik 8 MVA

Rorotan RPH Construction Reaches 95 Percent

Rorotan Slaughterhouse (RPH), Cilincing, North Jakarta, construction has reached 95 percent. It is targeted to complete on December 20 ahead.

This will be used to accommodate poultry traders in Marunda

"We hope construction to complete soon thus relocation can be accelerated. This will be used to accommodate poultry traders in Marunda," said Husein Murad, North Jakarta Mayor, when surveying the location, Wednesday (12/13).

RPH is built above 4,557 square meters land. It will be built 34 poultry shelters with 9 square meters each. It is considered to accommodate 200 chickens.

PD Dharma Jaya Ensures to Sell Quality Meat

Besides, there will be four manual abattoir and semi-auto abattoir. This building will be also equipped with food court, toilet, and office.

Meanwhile, Jakarta Maritime Agriculture and Food Tenacity (KPKP) Dept.'s Poultry and Animal Health Division Head, Sri Hartati informed, its inauguration is planned in January 2018 and it is start to operate in February.

"Rorotan RPH construction has reached 95 percent with budget around Rp 10.7 billion," she added.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye2168 personAldi Geri Lumban Tobing
  2. Betawi Eid in Ciganjur Goes Lively

    access_time02-05-2026 remove_red_eye2151 personTiyo Surya Sakti
  3. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye1950 personDessy Suciati
  4. Malaka Jaya Residents Take Part in Waste Sorting Program

    access_time03-05-2026 remove_red_eye1920 personNurito
  5. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye1907 personAldi Geri Lumban Tobing