You don't have javascript enabled. Good luck with that.
Pencarian
Rusun Rorotan dan Nagrak Dialiri Listrik 8 MVA

Rorotan RPH Construction Reaches 95 Percent

Rorotan Slaughterhouse (RPH), Cilincing, North Jakarta, construction has reached 95 percent. It is targeted to complete on December 20 ahead.

This will be used to accommodate poultry traders in Marunda

"We hope construction to complete soon thus relocation can be accelerated. This will be used to accommodate poultry traders in Marunda," said Husein Murad, North Jakarta Mayor, when surveying the location, Wednesday (12/13).

RPH is built above 4,557 square meters land. It will be built 34 poultry shelters with 9 square meters each. It is considered to accommodate 200 chickens.

PD Dharma Jaya Ensures to Sell Quality Meat

Besides, there will be four manual abattoir and semi-auto abattoir. This building will be also equipped with food court, toilet, and office.

Meanwhile, Jakarta Maritime Agriculture and Food Tenacity (KPKP) Dept.'s Poultry and Animal Health Division Head, Sri Hartati informed, its inauguration is planned in January 2018 and it is start to operate in February.

"Rorotan RPH construction has reached 95 percent with budget around Rp 10.7 billion," she added.

Linked News
Popular News indeks
  1. Jakarta Removes Gibran’s Portraits Across All Government Offices

    access_time16-11-2026 remove_red_eye1053 personFakhrizal Fakhri
  2. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye672 personAldi Geri Lumban Tobing
  3. Governor Approves Removal of Seven Unauthorized Houses on Dispora Land

    access_time13-11-2026 remove_red_eye651 personFakhrizal Fakhri
  4. Pramono Outlines Measures to Address Five Issues in Kramat Jati

    access_time13-11-2026 remove_red_eye632 personFakhrizal Fakhri
  5. Jakarta Esports 2026 Draws Enthusiastic Crowds at M Bloc Space

    access_time13-11-2026 remove_red_eye609 personTiyo Surya Sakti