You don't have javascript enabled. Good luck with that.
Pencarian
Rusun Rorotan dan Nagrak Dialiri Listrik 8 MVA

Rorotan RPH Construction Reaches 95 Percent

Rorotan Slaughterhouse (RPH), Cilincing, North Jakarta, construction has reached 95 percent. It is targeted to complete on December 20 ahead.

This will be used to accommodate poultry traders in Marunda

"We hope construction to complete soon thus relocation can be accelerated. This will be used to accommodate poultry traders in Marunda," said Husein Murad, North Jakarta Mayor, when surveying the location, Wednesday (12/13).

RPH is built above 4,557 square meters land. It will be built 34 poultry shelters with 9 square meters each. It is considered to accommodate 200 chickens.

PD Dharma Jaya Ensures to Sell Quality Meat

Besides, there will be four manual abattoir and semi-auto abattoir. This building will be also equipped with food court, toilet, and office.

Meanwhile, Jakarta Maritime Agriculture and Food Tenacity (KPKP) Dept.'s Poultry and Animal Health Division Head, Sri Hartati informed, its inauguration is planned in January 2018 and it is start to operate in February.

"Rorotan RPH construction has reached 95 percent with budget around Rp 10.7 billion," she added.

Linked News
Popular News indeks
  1. East Jakarta Satpol PP Deployed to Ensure Safe Eid Travel Period

    access_time16-03-2026 remove_red_eye1008 personNurito
  2. Car Free Night Held on Eid Eve, Be There!

    access_time19-03-2026 remove_red_eye695 personDessy Suciati
  3. Pramono Inaugurates 26 Home Renovation Units

    access_time16-03-2026 remove_red_eye663 personDessy Suciati
  4. Homecoming Travelers Surge Seen at Tanjung Priok Terminal

    access_time17-03-2026 remove_red_eye624 personAnita Karyati
  5. Health Services in Jakarta Remain Fully Operational During Nyepi and Eid al-Fitr Holidays

    access_time16-03-2026 remove_red_eye575 personTiyo Surya Sakti