You don't have javascript enabled. Good luck with that.
Pencarian
Warga Kapuk Muara Disuplai Air Bersih Melalui Sistem Perpipaan
.
photo Keren Margaret Vicer - Beritajakarta.id

Kapuk Muara Gets Water Supply Through Piping System

PDAM Jaya and PT. PAM Lyonnaise Jaya (Palyja), the operators, have cooperated to provide clean water for Kapuk Muara Urban Village, Penjaringan, North Jakarta through piping system.

In total, we have provided clean water for 1,700 families

PDAM Jaya Director, Erlan Hidayat said 600 families at RW 01, 04, and 05 already have an access for clean water. 1,100 families at Duta Harapan Indah Complex are also got this water service.

"In total, we have provided clean water for 1,700 families," he informed, Thursday (12/28).

Clean Water Supply Pipeline System in Pegadungan Reviewed

His side needs to put down 300 mm diameter pipeline on Jl. Teluk Gong from height of 4.5 meters into 2.5 meters, repair pipe leakage, do network optimization and pipe restoration in order to optimize clean water supply to Kapuk Muara Urban Village residents.

"This technical repair is done from August to November 2017," he conveyed.

His side has also asked PT. Palyja to replace residents' water meters to increase water debit into 20 liters per second.

"We will keep monitor to ensure water is supplied to residents," he mentioned.

Meanwhile, Kapuk Muara Urban Village's RW 04 Head, Muhammad Irsyad appreciates PDAM Jaya fast response in handle residents complaints through PT. Palyja.

"I hope this good performance could be enhanced or at least maintained. Thus residents can get the best service," he stated.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye397 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye353 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye325 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye317 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik