You don't have javascript enabled. Good luck with that.
Pencarian
PT MRT Jakarta Perketat Penilaian Faktor Keselamatan Kerja

PT MRT Jakarta Tightens Safety Factor Assessment

PT Mass Rapid Transit (MRT) Jakarta tightens safety factor assessment to contractors who participate in the physical construction of the MRT project. This assessment is done to prevent accidents to smoothen construction process in accordance with the plan.

It is tightened with value-reduction schemes

PT MRT President Director, William Sabandar said his party would specifically apply a scheme for Occupational Safety and Health (K3) of project workers.

"It is tightened with value-reduction schemes," he stated, when being confirmed in Jakarta, Monday (2/19).

Anies Visits PT MRT Jakarta Office

It applies to all contractors who involve in the MRT construction in phase I corridor I. The value-cut scheme to these contractors has been ongoing since March 2017.

"Demerit points can be interpreted as a form of penalty if the contractor made a mistake," he said.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1297 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1129 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye839 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye292 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye288 personAldi Geri Lumban Tobing