You don't have javascript enabled. Good luck with that.
Pencarian
PT MRT Jakarta Perketat Penilaian Faktor Keselamatan Kerja

PT MRT Jakarta Tightens Safety Factor Assessment

PT Mass Rapid Transit (MRT) Jakarta tightens safety factor assessment to contractors who participate in the physical construction of the MRT project. This assessment is done to prevent accidents to smoothen construction process in accordance with the plan.

It is tightened with value-reduction schemes

PT MRT President Director, William Sabandar said his party would specifically apply a scheme for Occupational Safety and Health (K3) of project workers.

"It is tightened with value-reduction schemes," he stated, when being confirmed in Jakarta, Monday (2/19).

Anies Visits PT MRT Jakarta Office

It applies to all contractors who involve in the MRT construction in phase I corridor I. The value-cut scheme to these contractors has been ongoing since March 2017.

"Demerit points can be interpreted as a form of penalty if the contractor made a mistake," he said.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5548 personBudhi Firmansyah Surapati
  2. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1879 personTiyo Surya Sakti
  3. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye890 personAldi Geri Lumban Tobing
  4. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye789 personAldi Geri Lumban Tobing
  5. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye761 personAldi Geri Lumban Tobing