You don't have javascript enabled. Good luck with that.
Pencarian
 Sudin Bina Marga Jakpus Betonisasi Jalan Gunung Sahari VII

Jalan Gunung Sahari VII Concreted

Jalan Gunung Sahari VII A, RW 03, Gunung Sahari Utara Urban Village, Sawah Besar is concreted. It is done to follow up on citizens' report in Musrenbang 2017.

The road has 1,078.5 meters length and 5.5 meters width

"The road has 1,078.5 meters length and 5.5 meters width. Currently we have repaired up to 300 meters," expressed Yudha, Division Head of Bridge and Road for Central Jakarta Bina Marge Sub-dept., Wednesday (5/16).

Jl. Muncang of Lagoa Urban Village Repaired

In the field, his side also repairs the damaged kanstine and waterway. The road itself is elevated up to 20 centimeters length in order to avoid inundation.

"It has been done since April 24. It is targeted to be done on August 7 prior to Asian Games," he said.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1090 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye575 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye499 personNurito
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye477 personAldi Geri Lumban Tobing
  5. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye475 personBudhi Firmansyah Surapati