You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Waduk Makoopsau I Dimulai

Makoopsau I Reservoir Dredging Started

Starting Friday (5/18), East Jakarta Water Resources (SDA) Sub-dept. dredges Makoopsau I Reservoir in Halim Perdana Kusuma, Makasar. Five heavy equipments owned by Jakarta SDA Dept.'s Alkal Unit are used for this dredging.

We will dredge it into 2.5-3 meters depth. Dredging is targeted to complete in around four months

East Jakarta SDA Sub-dept.'s Maintenance Section Head, Yoserizal said, dredging is done by request from TNI AU. It is reported this reservoir with around 10,750 square meters wide is silting.

Channel on Jalan Walter Monginsidi Dredged

"Because this reservoir is silting, TNI AU requests to dredge it. We immediately coordinate with Alkal Unit to send us heavy equipment," he stated, Friday (5/18).

According to him, it has around one meter depth. His side plans to dredge it until 2.5-3 meters depth. There are four amphibian long arm excavators and one standard excavator used to dredge it.

"We will dredge it into 2.5-3 meters depth. Dredging is targeted to complete in around four months," he conveyed.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1092 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye575 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye500 personNurito
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye480 personAldi Geri Lumban Tobing
  5. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye476 personBudhi Firmansyah Surapati