You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Waduk Makoopsau I Dimulai

Makoopsau I Reservoir Dredging Started

Starting Friday (5/18), East Jakarta Water Resources (SDA) Sub-dept. dredges Makoopsau I Reservoir in Halim Perdana Kusuma, Makasar. Five heavy equipments owned by Jakarta SDA Dept.'s Alkal Unit are used for this dredging.

We will dredge it into 2.5-3 meters depth. Dredging is targeted to complete in around four months

East Jakarta SDA Sub-dept.'s Maintenance Section Head, Yoserizal said, dredging is done by request from TNI AU. It is reported this reservoir with around 10,750 square meters wide is silting.

Channel on Jalan Walter Monginsidi Dredged

"Because this reservoir is silting, TNI AU requests to dredge it. We immediately coordinate with Alkal Unit to send us heavy equipment," he stated, Friday (5/18).

According to him, it has around one meter depth. His side plans to dredge it until 2.5-3 meters depth. There are four amphibian long arm excavators and one standard excavator used to dredge it.

"We will dredge it into 2.5-3 meters depth. Dredging is targeted to complete in around four months," he conveyed.

Linked News
Popular News indeks
  1. Still Rp 3,500! No Fare Change for Transjakarta’s Kalideres–Soetta Route

    access_time01-08-2026 remove_red_eye561 personAldi Geri Lumban Tobing
  2. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye561 personTiyo Surya Sakti
  3. Jakarta Gov Revs Up Efforts to Become Indonesia's Sport Tourism Hub

    access_time01-08-2026 remove_red_eye408 personFolmer
  4. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye402 personDessy Suciati
  5. Betawi Heritage Takes Center Stage at the 4th Betawi Mask Festival

    access_time01-08-2026 remove_red_eye402 personNurito