You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Waduk Makoopsau I Dimulai
.
photo Nurito - Beritajakarta.id

Makoopsau I Reservoir Dredging Started

Starting Friday (5/18), East Jakarta Water Resources (SDA) Sub-dept. dredges Makoopsau I Reservoir in Halim Perdana Kusuma, Makasar. Five heavy equipments owned by Jakarta SDA Dept.'s Alkal Unit are used for this dredging.

We will dredge it into 2.5-3 meters depth. Dredging is targeted to complete in around four months

East Jakarta SDA Sub-dept.'s Maintenance Section Head, Yoserizal said, dredging is done by request from TNI AU. It is reported this reservoir with around 10,750 square meters wide is silting.

Channel on Jalan Walter Monginsidi Dredged

"Because this reservoir is silting, TNI AU requests to dredge it. We immediately coordinate with Alkal Unit to send us heavy equipment," he stated, Friday (5/18).

According to him, it has around one meter depth. His side plans to dredge it until 2.5-3 meters depth. There are four amphibian long arm excavators and one standard excavator used to dredge it.

"We will dredge it into 2.5-3 meters depth. Dredging is targeted to complete in around four months," he conveyed.

Linked News
Popular News indeks
  1. 1,262 Personnel Ready to Support Bhayangkara Anniversary Cleanliness

    access_time30-06-2025 remove_red_eye584 personAldi Geri Lumban Tobing
  2. 4,072 Damaged Roads in Central Jakarta Have Been Repaired

    access_time04-07-2025 remove_red_eye332 personFolmer
  3. Dishub Pushes Digitization of Parking Management for Local Revenue

    access_time01-07-2025 remove_red_eye297 personFakhrizal Fakhri
  4. Transjabodetabek Bekasi-Galunggung Route Officially Operates

    access_time03-07-2025 remove_red_eye247 personDessy Suciati
  5. Pramono Asks for Onrust Island Tourism Potential to Be Optimized

    access_time04-07-2025 remove_red_eye238 personDessy Suciati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik