You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Waduk Makoopsau I Dimulai
.
photo Nurito - Beritajakarta.id

Makoopsau I Reservoir Dredging Started

Starting Friday (5/18), East Jakarta Water Resources (SDA) Sub-dept. dredges Makoopsau I Reservoir in Halim Perdana Kusuma, Makasar. Five heavy equipments owned by Jakarta SDA Dept.'s Alkal Unit are used for this dredging.

We will dredge it into 2.5-3 meters depth. Dredging is targeted to complete in around four months

East Jakarta SDA Sub-dept.'s Maintenance Section Head, Yoserizal said, dredging is done by request from TNI AU. It is reported this reservoir with around 10,750 square meters wide is silting.

Channel on Jalan Walter Monginsidi Dredged

"Because this reservoir is silting, TNI AU requests to dredge it. We immediately coordinate with Alkal Unit to send us heavy equipment," he stated, Friday (5/18).

According to him, it has around one meter depth. His side plans to dredge it until 2.5-3 meters depth. There are four amphibian long arm excavators and one standard excavator used to dredge it.

"We will dredge it into 2.5-3 meters depth. Dredging is targeted to complete in around four months," he conveyed.

Linked News
Popular News indeks
  1. Tanah Abang SDA Taskforce Normalizes Channels in Two Locations

    access_time12-05-2025 remove_red_eye466 personFolmer
  2. Community Work Held to Clean Environment in Petamburan

    access_time11-05-2025 remove_red_eye361 personFolmer
  3. Food Station Signs Farming Contracts in Rorotan

    access_time12-05-2025 remove_red_eye308 personAldi Geri Lumban Tobing
  4. Pramono Focuses on Increasing Equal Access to Education

    access_time15-05-2025 remove_red_eye264 personDessy Suciati
  5. Commission D Supports Construction of Rorotan Rusunawa

    access_time10-05-2025 remove_red_eye263 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik