You don't have javascript enabled. Good luck with that.
Pencarian
Wagub Minta Sosialisasi Rekayasa Lalin Simpang Duren Tiga Dioptimalkan
.
photo Reza Hapiz - Beritajakarta.id

Traffic Engineering Trial on Jalan Mampang Prapatan Raya Stopped

The traffic engineering trial along Jalan Mampang Prapatan Raya, South Jakarta had to be stopped. Traffic through the intersections in the region has returned to normal.

I want socialization about traffic engineering trial to be more maximized first

Jakarta Deputy Governor, Sandiaga Uno expressed he instructed Transportation Dept. to stop its trial.

"I want socialization about traffic engineering trial to be more maximized first," he told, Sunday (5/20).

No Car Free Day Along Jalan Mampang-Buncit During Ramadan

He explained, it is conducted to maximize traffic flow in aftermath of Mampang Underpass operational.

"We want to parse traffic jam in the area," he told.

Separately, Jakarta Transportation Dept. Vice Head, Sigit Widjatmoko stated it is only temporary and will be evaluated by taking into account the aspirations of the people.

"Three intersections closure is done based on analysis and study. Surely, we will make more intense communication with the people," he stated.

As reported earlier, there were three closed intersections, namely Jalan Mampang Prapatan Raya, Jalan Duren Tiga Selatan and Jalan Duren Bangka.

It is targeted can be smoother, as traffic light is reduced. It's mainly for vehicles from the north (Jalan HR Rasuna Said-Ragunan) or vice versa.

Linked News
Popular News indeks
  1. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye829 personAnita Karyati
  2. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye783 personFolmer
  3. Jakarta Aeromodelling Team Grabs First Gold Medal

    access_time16-09-2024 remove_red_eye557 personAldi Geri Lumban Tobing
  4. Area Arrangement on Jalan Kramat to Complete this Weekend

    access_time17-09-2024 remove_red_eye432 personTiyo Surya Sakti
  5. Area Arrangement on Jalan Setapak Reaches 95 Percent

    access_time14-09-2024 remove_red_eye365 personTiyo Surya Sakti