You don't have javascript enabled. Good luck with that.
Pencarian
 Taman dan Pedestrian Terkena Dampak Pembangunan MRT Ditata
.
photo Wuri Setyaningsih - Beritajakarta.id

Parks and Sidewalks Affected By MRT Construction Arranged

It is one of our commitment to arrange parks and sidewalks affected by this construction

PT. Mass Rapid Transit (MRT) Jakarta starts to arrange parks and sidewalks affected by MRT construction project.

PT. MRT Jakarta Director, William Sabandar mentioned, his side arranges 1.2 kilometers sidewalks and parks in total.

PT MRT Conducts Signal and Electric Test at Lebak Bulus Depot

"It is one of our commitment to arrange parks and sidewalks affected by this construction," he stated after Halal Bihalal event at Nusantara Building, 22nd floor, Jalan Jendral Sudirman, Central Jakarta, Thursday (6/28).

Currently his side arranges some sidewalks and parks located in Senayan Station, Istora Station, Bendungan Hilir Station, Setiabudi Station, and Dukuh Atas Station.

Besides, PT. MRT is also concreting and straightening roads affected by MRT construction. Concreting is done by cooperation with Jakarta Bina Marga Dept. and Ministry of Public Works and Public Housing (PUPR).

"We also hope residents can participate in maintaining these facilities in the future," he conveyed.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye966 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye778 personBudhi Firmansyah Surapati
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye445 personFolmer
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye410 personTiyo Surya Sakti
  5. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye351 personBudhi Firmansyah Surapati