You don't have javascript enabled. Good luck with that.
Pencarian
 Taman dan Pedestrian Terkena Dampak Pembangunan MRT Ditata

Parks and Sidewalks Affected By MRT Construction Arranged

It is one of our commitment to arrange parks and sidewalks affected by this construction

PT. Mass Rapid Transit (MRT) Jakarta starts to arrange parks and sidewalks affected by MRT construction project.

PT. MRT Jakarta Director, William Sabandar mentioned, his side arranges 1.2 kilometers sidewalks and parks in total.

PT MRT Conducts Signal and Electric Test at Lebak Bulus Depot

"It is one of our commitment to arrange parks and sidewalks affected by this construction," he stated after Halal Bihalal event at Nusantara Building, 22nd floor, Jalan Jendral Sudirman, Central Jakarta, Thursday (6/28).

Currently his side arranges some sidewalks and parks located in Senayan Station, Istora Station, Bendungan Hilir Station, Setiabudi Station, and Dukuh Atas Station.

Besides, PT. MRT is also concreting and straightening roads affected by MRT construction. Concreting is done by cooperation with Jakarta Bina Marga Dept. and Ministry of Public Works and Public Housing (PUPR).

"We also hope residents can participate in maintaining these facilities in the future," he conveyed.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye784 personFakhrizal Fakhri
  2. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye622 personTiyo Surya Sakti
  3. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye417 personAldi Geri Lumban Tobing
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye381 personAldi Geri Lumban Tobing
  5. East Jakarta Steps Up Services to Simplify Population Registration

    access_time20-04-2026 remove_red_eye347 personNurito