You don't have javascript enabled. Good luck with that.
Pencarian
 Taman dan Pedestrian Terkena Dampak Pembangunan MRT Ditata

Parks and Sidewalks Affected By MRT Construction Arranged

It is one of our commitment to arrange parks and sidewalks affected by this construction

PT. Mass Rapid Transit (MRT) Jakarta starts to arrange parks and sidewalks affected by MRT construction project.

PT. MRT Jakarta Director, William Sabandar mentioned, his side arranges 1.2 kilometers sidewalks and parks in total.

PT MRT Conducts Signal and Electric Test at Lebak Bulus Depot

"It is one of our commitment to arrange parks and sidewalks affected by this construction," he stated after Halal Bihalal event at Nusantara Building, 22nd floor, Jalan Jendral Sudirman, Central Jakarta, Thursday (6/28).

Currently his side arranges some sidewalks and parks located in Senayan Station, Istora Station, Bendungan Hilir Station, Setiabudi Station, and Dukuh Atas Station.

Besides, PT. MRT is also concreting and straightening roads affected by MRT construction. Concreting is done by cooperation with Jakarta Bina Marga Dept. and Ministry of Public Works and Public Housing (PUPR).

"We also hope residents can participate in maintaining these facilities in the future," he conveyed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1304 personFolmer
  4. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati
  5. MRT Phase 2A Northbound Tunnel Excavation Completed

    access_time09-07-2026 remove_red_eye844 personAldi Geri Lumban Tobing