You don't have javascript enabled. Good luck with that.
Pencarian
659 Lampu Akan Dipasang di Kolong JLNT Ciledug-Tendean
.
photo Erna Martiyanti - Beritajakarta.id

659 Lamps to Light Up Under Transjakarta Corridor 13

Around 659 streetlight lamps type ceiling will be installed under the flyover of Transjakarta plying Corridor 13 (Ciledug-Tendean) in the near future.

And now we will continue to the bottom

Suryanto, Head of South Jakarta Industry and Energy Sub-dept. said 330 lamps have been installed at the top of the flyover.

"And now we will continue to the bottom," he expressed, Thursday (7/12).

PE Dept. Installs 57,101 Smart LED Lamps This Year

Thus far its installation on the bottom has entered the stage of making streetlight pole foundation at 130 points. 

It is hoped able to smoothen the operational of Transjakarta bus at the corridor, including for other passing vehicles.

As for the information, streetlight lamps type armatur installed at the top of the flyover have 200 watts power. The lamp itself is LED smart system.

Linked News
Popular News indeks
  1. Rano Inspects Location and Delivers Aid to Fire Victims in Bukit Duri

    access_time20-07-2025 remove_red_eye607 personNurito
  2. Assistance Continues to Be Provided to Bukit Duri Fire Victims

    access_time20-07-2025 remove_red_eye428 personNurito
  3. Rano Ensures Swift Action in Bukit Duri Fire Handling

    access_time19-07-2025 remove_red_eye389 personFakhrizal Fakhri
  4. C. Jakarta TP PKK Grows 2,470 Chili and Tomato Seedlings

    access_time18-07-2025 remove_red_eye386 personFolmer
  5. Munjirin Leads Simultaneous Planting at RPTRA Rawa Jaya

    access_time18-07-2025 remove_red_eye379 personNurito

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik