You don't have javascript enabled. Good luck with that.
Pencarian
 Kereta Pertama MRT Jakarta Diuji Coba

First MRT Jakarta Train Tested

PT. Mass Rapid Transit (MRT) Jakarta conducts System Acceptance Test (SAT) to the first Jakarta MRT train at Lebak Bulus Depot, South Jakarta, Thursday (8/9). This test needs to be conducted before MRT Jakarta operates fully on March 2019.

Through this test, we can also check whether its electric supply is good or not

PT. MRT Jakarta Director, William Sabandar stated, his side will test train signalling system, telecommunication, and Overhead Catenary System (OCS) by operating train from Depot Inspection Shed Area, Stabling Track 1, until Depot Access Line (DAL)

"Through this test, we can also check whether its electric supply is good or not by using Automatic Train Protection (ATP) in manual mode by machinist for railway in Depot," he explained, Friday (8/10).

PT MRT Jakarta Gears Up to Do Signaling Integration Trial

 

His side also tested to operate it in low speed, medium, and high speed. MRT Jakarta also uses Communication- Based Train Control (CBTC) for its signalling system which is controlled by Traffic Dispatcher from Operation Control Center (OCC) room.

"One of this signaling system advantages is OCC can set the time span between trains in the main line," he informed.

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2635 personNurito
  2. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2362 personTiyo Surya Sakti
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye980 personFolmer
  4. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye952 personAldi Geri Lumban Tobing
  5. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye845 personFakhrizal Fakhri