You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air di Jalan Petojo Binatu Raya Dinormalisasi

Water Channel on Jalan Petojo Binatu Raya Dredged

Gambir Sub-district Water Resources Unit, Central Jakarta, is dredging water channel on Jalan Petojo Binatu Raya, Petojo Utara, Gambir.

We deploy 15 personnel and one mini excavator

Central Jakarta Water Resources (SDA) Sub-dept.'s Gambir Sub-district Unit Head, Arum said, water channel dredging is done as resident's request in development planning discussion (musrenbang).

Channel of Jalan Sabangan I Dredged from Mud

"We deploy 15 personnel and one mini excavator. We have dredging it since last week and it is planned to be finished on early October," she stated, Monday (9/17).

She explained, this 100-meter channel is silting from one meter into half meter depth.

"We will also build a new crossing and construct it with river stones to prevent clogging," she mentioned.

Linked News
Popular News indeks
  1. 129 Motorcycle Parked Illegally in Daan Mogot Controlled

    access_time08-11-2026 remove_red_eye731 personBudhi Firmansyah Surapati
  2. Kampung Melayu Sports Facility Inaugurated to Tackle Brawls

    access_time06-11-2026 remove_red_eye690 personDessy Suciati
  3. Jakarta to Develop Its First Mangrove Botanical Garden

    access_time06-11-2026 remove_red_eye679 personDessy Suciati
  4. Kampung Rambutan 1 Reservoir to Combine Flood Control with Public Recreation

    access_time06-11-2026 remove_red_eye652 personAldi Geri Lumban Tobing
  5. Aid for Fire Survivors at Pinus Elok Flats Has Been Distributed

    access_time06-11-2026 remove_red_eye650 personNurito