You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Sepanjang 100 Meter di Jalan Abdul Muis Dinormalisasi

Water Channel on Jalan Abdul Muis Normalized

Central Jakarta Water Resources (SDA) Sub-dept. normalizes water channel on Jalan Abdul Muis, Gambir.

We normalizes channel with 100 meters long, one meter deep and 80 meters wide

This normalization is including dredging, driveway dismantling, and manhole construction.

Jalan Petojo VII Cideng's Water Channel Dredged

"We normalize channel with 100 meters long, one meter deep and 80 meters wide. We use sand and river stones materials," mentioned Fajar, Central Jakarta SDA Sub-dept.'s Development Section Head, Friday (9/21).

This channel has silted up and becomes narrow because it is covered by driveway. His side is targeting to complete normalization in October 2018.

"We also deploy 10 personnel and one mini excavator in this normalization," he conveyed.

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2633 personNurito
  2. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2354 personTiyo Surya Sakti
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye974 personFolmer
  4. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye835 personFakhrizal Fakhri
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye734 personBudhi Firmansyah Surapati