You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Sepanjang 100 Meter di Jalan Abdul Muis Dinormalisasi
.
photo Suparni - Beritajakarta.id

Water Channel on Jalan Abdul Muis Normalized

Central Jakarta Water Resources (SDA) Sub-dept. normalizes water channel on Jalan Abdul Muis, Gambir.

We normalizes channel with 100 meters long, one meter deep and 80 meters wide

This normalization is including dredging, driveway dismantling, and manhole construction.

Jalan Petojo VII Cideng's Water Channel Dredged

"We normalize channel with 100 meters long, one meter deep and 80 meters wide. We use sand and river stones materials," mentioned Fajar, Central Jakarta SDA Sub-dept.'s Development Section Head, Friday (9/21).

This channel has silted up and becomes narrow because it is covered by driveway. His side is targeting to complete normalization in October 2018.

"We also deploy 10 personnel and one mini excavator in this normalization," he conveyed.

Linked News
Popular News indeks
  1. 104 Wild Cats in Kebayoran Lama Sterilized

    access_time07-11-2024 remove_red_eye794 personTiyo Surya Sakti
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye782 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye482 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye379 personBudhi Firmansyah Surapati
  5. Semongol River Dredging Intensified

    access_time06-11-2024 remove_red_eye337 personTP Moan Simanjuntak