You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Sepanjang 100 Meter di Jalan Abdul Muis Dinormalisasi

Water Channel on Jalan Abdul Muis Normalized

Central Jakarta Water Resources (SDA) Sub-dept. normalizes water channel on Jalan Abdul Muis, Gambir.

We normalizes channel with 100 meters long, one meter deep and 80 meters wide

This normalization is including dredging, driveway dismantling, and manhole construction.

Jalan Petojo VII Cideng's Water Channel Dredged

"We normalize channel with 100 meters long, one meter deep and 80 meters wide. We use sand and river stones materials," mentioned Fajar, Central Jakarta SDA Sub-dept.'s Development Section Head, Friday (9/21).

This channel has silted up and becomes narrow because it is covered by driveway. His side is targeting to complete normalization in October 2018.

"We also deploy 10 personnel and one mini excavator in this normalization," he conveyed.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye786 personFakhrizal Fakhri
  2. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye622 personTiyo Surya Sakti
  3. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye481 personAldi Geri Lumban Tobing
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye383 personAldi Geri Lumban Tobing
  5. East Jakarta Steps Up Services to Simplify Population Registration

    access_time20-04-2026 remove_red_eye356 personNurito