You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Sepanjang 100 Meter di Jalan Abdul Muis Dinormalisasi

Water Channel on Jalan Abdul Muis Normalized

Central Jakarta Water Resources (SDA) Sub-dept. normalizes water channel on Jalan Abdul Muis, Gambir.

We normalizes channel with 100 meters long, one meter deep and 80 meters wide

This normalization is including dredging, driveway dismantling, and manhole construction.

Jalan Petojo VII Cideng's Water Channel Dredged

"We normalize channel with 100 meters long, one meter deep and 80 meters wide. We use sand and river stones materials," mentioned Fajar, Central Jakarta SDA Sub-dept.'s Development Section Head, Friday (9/21).

This channel has silted up and becomes narrow because it is covered by driveway. His side is targeting to complete normalization in October 2018.

"We also deploy 10 personnel and one mini excavator in this normalization," he conveyed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye393 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
close