You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Saluran Marunda Armain Kerahkan Dua Eskavator Amphibi

Marunda Armain PHB Channel Dredged Using Two Amphibian Excavators

North Jakarta SDA Sub-dept. deploys two amphibian excavators to dredge Marunda Armain PHB channel, Rorotan Urban Village, Cilincing.

We want to anticipate inundation in Marunda and Rorotan Urban Villages during rainy season by adding its depth

Cilincing SDA Unit Head, Sarkam said, dredging is done to make drainage water in Rorotan and Marunda Urban Villages that flows to Cakung Drain can run optimally.

Boulevard Barat Channel Repair Targeted to Complete This October

"We want to anticipate inundation in Marunda and Rorotan Urban Villages during rainy season by adding its depth," he conveyed, Monday (10/15).

His side expects dredging on this 2,000-meter channel can be accelerated by using those two excavators.

"Dredging has been started since Thursday (10/11). It needs around one month to finish," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye711 personTiyo Surya Sakti
  3. Pramono: Jakarta Government Acts Swiftly to Tackle Flooding

    access_time30-01-2026 remove_red_eye370 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye369 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye362 personDessy Suciati
close