You don't have javascript enabled. Good luck with that.
Pencarian
       JPO TB Simatupang di Modifikasi Minggu

PT MRT to Modify TB Simatupang Crossing Bridge

PT MRT Jakarta is about to modify a crossing bridge (JPO) on Jalan TB Simatupang and Jakarta Outer Ring Road KM 22+000 on Sunday (2/3).

Modification is needed to accommodate wide targets per 3.5 meter lane

Jakarta PT MRT's Corporate Secretary Division Head, Muhamad Kamaluddin said that it is needed, as the road only has 4.3 meters width. After the MRT operates, the road would have two lanes with 7 meters width.

Locals Happy with Soemarno Crossing Bridge

"Modification is needed to accommodate wide targets per 3.5 meter lane," he expressed, Thursday (1/31).

He stated that the bridge girder installation will be executed on February 3 at 10 PM-4 AM.

"The road on the south will be closed and traffic management will be applied at outer ring road toll road," he stated.

During the work, vehicle can use junction of Jalan Fatmawati - Jalan TB Simatupang, which is located around 400 meters from the bridge location. They can also use Jalan Lebak Bulus 1 as an alternative route to Lebak Bulus, Pondok Indah, or Ciputat.

"The bridge design consists of pc concrete (T-Beam) girder with a 24-meter-length span and is above the Jakarta Outer Ring Road Toll Road," he said.

Linked News
Popular News indeks
  1. Jakarta Set to Launch Historic Municipal Bonds, Pramono Says

    access_time01-07-2026 remove_red_eye1190 personDessy Suciati
  2. Jakarta KPU Records More Than 8.2 Million Registered Voters

    access_time06-07-2026 remove_red_eye889 personFolmer
  3. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye609 personNurito
  4. Jakartans Can Now Access 3-Day Air Quality Forecasts

    access_time06-07-2026 remove_red_eye581 personAldi Geri Lumban Tobing
  5. Central Jakarta Continues Pursuing a Target of 50 Percent Waste Sorting

    access_time06-07-2026 remove_red_eye559 personFolmer