You don't have javascript enabled. Good luck with that.
Pencarian
       JPO TB Simatupang di Modifikasi Minggu

PT MRT to Modify TB Simatupang Crossing Bridge

PT MRT Jakarta is about to modify a crossing bridge (JPO) on Jalan TB Simatupang and Jakarta Outer Ring Road KM 22+000 on Sunday (2/3).

Modification is needed to accommodate wide targets per 3.5 meter lane

Jakarta PT MRT's Corporate Secretary Division Head, Muhamad Kamaluddin said that it is needed, as the road only has 4.3 meters width. After the MRT operates, the road would have two lanes with 7 meters width.

Locals Happy with Soemarno Crossing Bridge

"Modification is needed to accommodate wide targets per 3.5 meter lane," he expressed, Thursday (1/31).

He stated that the bridge girder installation will be executed on February 3 at 10 PM-4 AM.

"The road on the south will be closed and traffic management will be applied at outer ring road toll road," he stated.

During the work, vehicle can use junction of Jalan Fatmawati - Jalan TB Simatupang, which is located around 400 meters from the bridge location. They can also use Jalan Lebak Bulus 1 as an alternative route to Lebak Bulus, Pondok Indah, or Ciputat.

"The bridge design consists of pc concrete (T-Beam) girder with a 24-meter-length span and is above the Jakarta Outer Ring Road Toll Road," he said.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1723 personDessy Suciati
  2. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye482 personDessy Suciati
  3. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye455 personDessy Suciati
  4. No Damage Reported Following Magnitude 5.9 Seribu Islands Quake

    access_time12-09-2026 remove_red_eye449 personBudhi Firmansyah Surapati
  5. Ketapang TPS 3R Processes 13 Tons of Waste from Duri Pulo and Petojo Utara

    access_time11-09-2026 remove_red_eye434 personFolmer