You don't have javascript enabled. Good luck with that.
Pencarian
       JPO TB Simatupang di Modifikasi Minggu

PT MRT to Modify TB Simatupang Crossing Bridge

PT MRT Jakarta is about to modify a crossing bridge (JPO) on Jalan TB Simatupang and Jakarta Outer Ring Road KM 22+000 on Sunday (2/3).

Modification is needed to accommodate wide targets per 3.5 meter lane

Jakarta PT MRT's Corporate Secretary Division Head, Muhamad Kamaluddin said that it is needed, as the road only has 4.3 meters width. After the MRT operates, the road would have two lanes with 7 meters width.

Locals Happy with Soemarno Crossing Bridge

"Modification is needed to accommodate wide targets per 3.5 meter lane," he expressed, Thursday (1/31).

He stated that the bridge girder installation will be executed on February 3 at 10 PM-4 AM.

"The road on the south will be closed and traffic management will be applied at outer ring road toll road," he stated.

During the work, vehicle can use junction of Jalan Fatmawati - Jalan TB Simatupang, which is located around 400 meters from the bridge location. They can also use Jalan Lebak Bulus 1 as an alternative route to Lebak Bulus, Pondok Indah, or Ciputat.

"The bridge design consists of pc concrete (T-Beam) girder with a 24-meter-length span and is above the Jakarta Outer Ring Road Toll Road," he said.

Linked News
Popular News indeks
  1. East Jakarta Satpol PP Deployed to Ensure Safe Eid Travel Period

    access_time16-03-2026 remove_red_eye1008 personNurito
  2. Car Free Night Held on Eid Eve, Be There!

    access_time19-03-2026 remove_red_eye698 personDessy Suciati
  3. Pramono Inaugurates 26 Home Renovation Units

    access_time16-03-2026 remove_red_eye663 personDessy Suciati
  4. Homecoming Travelers Surge Seen at Tanjung Priok Terminal

    access_time17-03-2026 remove_red_eye625 personAnita Karyati
  5. Jakarta Leaders Join Residents for Eid al-Fitr Prayer at City Hall

    access_time21-03-2026 remove_red_eye606 personFolmer