You don't have javascript enabled. Good luck with that.
Pencarian
Turap Longsor PHB Kalibaru Barat Diperbaiki

SDA Personnel Repair Kalibaru PHB Channel's Collapsed Retaining Wall

South Jakarta Water Resources (SDA) Sub-department repairs Kalibaru Barat connecting (PHB) channel's collapsed retaining wall, Jalan Haji Noor, Pasar Minggu. It is done to follow up report via CRM application.

Residents report it via CRM and we immediately respond it by starting the repair on January 28

South Jakarta SDA Sub-department's Maintenance Section Head, Firmansyah informed, soil near the retaining wall is unstable thus it causes retaining wall to collapse.

"Residents report it via CRM and we immediately respond it by starting the repair on January 28. Our target is to complete this repair in a month," he stated, Friday (2/1).

Permanent Retaining Wall Built on Kali Pulo PHB Channel

Pasar Minggu SDA Unit's Field Coordinator, Didi Supriadi deploys 8 personnel to repair collapsed retaining wall as high as 6.5 meters and as long as 6 meters long. 

"We use strauss pile foundation and link it using pile cap. Besides, we also use river stones to build the retaining wall then concrete it horizontally and vertically," he explained.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye972 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye933 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye828 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye710 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye607 personAnita Karyati