You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Mini Komunal di Kali Sentiong Ditarget September Selesai

September, Communal IPALs Construction Near Sentiong River Completed

PD. PAL Jaya is targeting in September 2019 to complete mini communal wastewater treatment plant (IPAL) near Sentiong River, Kemayoran, Central Jakarta. It is used to reduce waste pollution in Sentiong River.

We plan to build 20 mini communal IPALs and two interceptors for the pilot project

PD. PAL Jaya President Director, Subekti stated, his side is about to socialize local residents about mini communal construction plan this week.

Zone 0 Sewage Pipeline Network Installation Reaches 101 Kilometers

"We plan to build 20 mini communal IPALs and two interceptors for the pilot project. Our target is to complete it in September," he mentioned, Monday (2/18).

According to him, 20 mini communal IPALs are about to be built on Jalan Serdang 1, Jalan Serdang 5, and Jalan Serdang 6. Then, two interceptors in Kemayoran Sub-district office and pump house.

"Locals to be socialized by this week," he added.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1087 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye570 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye487 personNurito
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye472 personAldi Geri Lumban Tobing
  5. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye470 personBudhi Firmansyah Surapati