You don't have javascript enabled. Good luck with that.
Pencarian
Rumah Pompa Wijayakusuma Selesai Diperbaki

Wijayakusuma Pump House Repair Finished

Wijayakusuma pump house repair in Grogol Petamburan Sub-district which is started on early February is currently finished.

Our performance in handling inundation and flood in Wijayakusuma Urban Village become more optimal with these additional pumps

West Jakarta Water Resources (SDA) Sub-department's Maintenance Section Head, Juniarto Ardiansyah said, his side has repaired several pump house facilities and leakage on its deck. Now, it can operate optimally to anticipate inundation and flood.

Don Bosco Pump House Ready to Operate

Moreover, his side added existing pump capacity into 1,000 liter per second and three new pumps with capacity 750 liters per second.

"Our performance in handling inundation and flood in Wijayakusuma Urban Village become more optimal with these additional pumps," he stated.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5420 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4571 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1768 personTiyo Surya Sakti
  4. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye994 personFakhrizal Fakhri
  5. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye945 personAldi Geri Lumban Tobing