You don't have javascript enabled. Good luck with that.
Pencarian
 Beronjong Sepanjang 108 Meter Dipasang di Pulau Lancang

75 Gabions Installed on Lancang Island to Hold Waves

Thousand Island Water Resources (SDA) Sub-department installs gabion at RT 01 RW 01 of Lancang Island, Pari Island Urban Village, South Thousand Islands to hold the waves.

We deploy 17 PJLP personnel to install 75 gabions with length 108 meters

Thousand Island SDA Sub-department Head, Ahmad Saiful stated, gabion installation has been started since last month and targeted to finish three days ahead.

"We deploy 17 PJLP personnel to install 75 gabions with length 108 meters," he informed, Tuesday (5/14).

50 Absorption Wells in Thousand Islands Developed

He explained, those gabions are installed in the eastern side and southern side of Lancang Island to hold waves and prevent abrasion on breakwater cubes.

Linked News
Popular News indeks
  1. Commission E Enlists Religious Leaders to Fight Drugs and Violence

    access_time24-07-2026 remove_red_eye1232 personFakhrizal Fakhri
  2. The 2026 SEA V Cup Officially Begins

    access_time23-07-2026 remove_red_eye1186 personAldi Geri Lumban Tobing
  3. Jakarta Government Prepares Rp 249 B to Renovate Four Schools

    access_time25-07-2026 remove_red_eye821 personDessy Suciati
  4. Pramono Praises Baznas and Private Sector Synergy at Home Renovation

    access_time21-07-2026 remove_red_eye774 personDessy Suciati
  5. 20 Shade Trees Planted on Jalan Komodor Halim Perdanakusuma

    access_time24-07-2026 remove_red_eye766 personNurito