You don't have javascript enabled. Good luck with that.
Pencarian
 Beronjong Sepanjang 108 Meter Dipasang di Pulau Lancang
.
photo Suparni - Beritajakarta.id

75 Gabions Installed on Lancang Island to Hold Waves

Thousand Island Water Resources (SDA) Sub-department installs gabion at RT 01 RW 01 of Lancang Island, Pari Island Urban Village, South Thousand Islands to hold the waves.

We deploy 17 PJLP personnel to install 75 gabions with length 108 meters

Thousand Island SDA Sub-department Head, Ahmad Saiful stated, gabion installation has been started since last month and targeted to finish three days ahead.

"We deploy 17 PJLP personnel to install 75 gabions with length 108 meters," he informed, Tuesday (5/14).

50 Absorption Wells in Thousand Islands Developed

He explained, those gabions are installed in the eastern side and southern side of Lancang Island to hold waves and prevent abrasion on breakwater cubes.

Linked News
Popular News indeks
  1. Pramono Ensures KJP will Continue to Be Distributed

    access_time26-06-2025 remove_red_eye302 personDessy Suciati
  2. Most Residents Satisfied with Pramono-Rano's Performance

    access_time25-06-2025 remove_red_eye300 personDessy Suciati
  3. Governor Pramono: Jakarta E-Prix 2025 in Ancol is Amazing!

    access_time21-06-2025 remove_red_eye267 personDessy Suciati
  4. Here are Parking Spaces around Lapangan Banteng for Jakarta's Anniversary

    access_time21-06-2025 remove_red_eye261 personAldi Geri Lumban Tobing
  5. No Car Free Day on June 29 to Support Jakarta International Marathon 2025

    access_time24-06-2025 remove_red_eye234 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik