You don't have javascript enabled. Good luck with that.
Pencarian
 Beronjong Sepanjang 108 Meter Dipasang di Pulau Lancang

75 Gabions Installed on Lancang Island to Hold Waves

Thousand Island Water Resources (SDA) Sub-department installs gabion at RT 01 RW 01 of Lancang Island, Pari Island Urban Village, South Thousand Islands to hold the waves.

We deploy 17 PJLP personnel to install 75 gabions with length 108 meters

Thousand Island SDA Sub-department Head, Ahmad Saiful stated, gabion installation has been started since last month and targeted to finish three days ahead.

"We deploy 17 PJLP personnel to install 75 gabions with length 108 meters," he informed, Tuesday (5/14).

50 Absorption Wells in Thousand Islands Developed

He explained, those gabions are installed in the eastern side and southern side of Lancang Island to hold waves and prevent abrasion on breakwater cubes.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1459 personAldi Geri Lumban Tobing
  2. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye1010 personDessy Suciati
  3. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye989 personDessy Suciati
  4. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye789 personAldi Geri Lumban Tobing
  5. Accelerating Jakarta`s Global City Development, Pramono Inaugurates Urban Knowledge Hub

    access_time08-06-2026 remove_red_eye690 personDessy Suciati