You don't have javascript enabled. Good luck with that.
Pencarian
Transjakarta Buka Rute Integrasi ke Stasiun LRT Velodrome
.
photo istimewa - Beritajakarta.id

Transjakarta Opens New Route Integrated with LRT Velodrome Station

PT. Transjakarta opens JAK 34 that serves Rawamangun-Klender route with total length of 27 kilometers.

This route has 58 bus stop points

"This route has 58 bus stop points. First, we will provide 11 public minivans operated by Komika Jaya to support this route," PT. Transjakarta Operation Director, Daud Joseph mentioned, Thursday (5/16).

PT Transjakarta Stages Electric Bus Trials

JAK 34 route is integrated with LRT's Velodrome Station, East Jakarta, then also Transjakarta corridor 11 (Kampung Melayu-Pulo Gebang), JAK 26 (Duren Sawit-Rawamangun), and JAK 59 (Rawamangun-Rawa Sengon).

"Transjakarta bus shelter and LRT station will be connected through skybridge to facilitate LRT passengers who want to continue their trip using Transjakarta bus," he explained.

Here are the JAK 34 route's bus stops:

Across Jalan Nusa Indah Li, Jalan Delima 1A, across Nusa Indah, Pondok Kopi Islamic Hospital, Institut Teknologi Budi Utomo, Bimbel Calistung, across Masjid As Saadah, across Beringin 4 Alley, Universitas Dharma Persada, across Asih Budi Foundation, BKT 2 bridge, across Benda Market, across SDN 01 Pagi Duren Sawit, Jalan Bumi Raya.

Next, across Jalan Taman Bayu, Segar Amanah School, Kali Tegal Amba Bridge, Jalan Tegal Amba Guru H Saenan, across BKB Paud Kuncup Mekar, Borobudur Motor, across Putra Utama 1 Orphanage, Jalan Bulak Tengah Li intersection, Bulak Market, Klender 2 Flyover, Klender 2 Station, across Cipinang Lontar, Cipinang Penitentiary Institution, across Cipinang Penitentiary Institution.

Then, Kompleks Polri Cipinang Atas, Logistik Polri, Pulogadung Police Station intersection, Civil Registration 1 Sub-department building, Jalan Sawo III, Rawamangun Market intersection, Puskesmas Rawamangun, and Rawamangun Total Buah (fruit merchant).

Linked News
Popular News indeks
  1. South Jakarta Keeps Anticipating Potential for Inundation and Flooding

    access_time17-04-2024 remove_red_eye872 personTiyo Surya Sakti
  2. 10 Firetrucks Handle Fire in Kayu Putih

    access_time23-04-2024 remove_red_eye763 personNurito
  3. Water Channel Being Constructed on Pramuka Island

    access_time18-04-2024 remove_red_eye720 personAnita Karyati
  4. City - Sojitz Corporation Cooperate to Speed Up MRT 2A Phase

    access_time18-04-2024 remove_red_eye561 personFolmer
  5. Kebon Sayur Water Channel Dredged

    access_time19-04-2024 remove_red_eye450 personTP Moan Simanjuntak