You don't have javascript enabled. Good luck with that.
Pencarian
 MRT Fase 2 akan Terintegrasi dengan Stasiun Kota

MRT Phase 2 will Be Integrated with Kota Station

PT MRT Jakarta stated that the MRT phase 2 with route HI Roundabout (HI)-Kota will be integrated with Kota Station.

It will also be integrated with Kota Tua

"It will also be integrated with Kota Tua," expressed PT MRT Jakarta President Director, William Sabandar, Thursday (6/20).

MRT Phase 2 and Phase 1 Construction are Simultaneously

Even, there will be several stations that are historical and monumental in the Monas, Harmoni and Kota Tua areas.

"This phase 2 has 8.3 kilometers length with a distance of about 20 minutes from the HI Roundabout to Kota Tua," he told.

The next phase is planned to be made across the underground. Its depth is also made deeper than phase 1.

"Phase 2 is totally developed underground," he stated.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1467 personFolmer
  2. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye1273 personAldi Geri Lumban Tobing
  3. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye1182 personAldi Geri Lumban Tobing
  4. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye1013 personFolmer
  5. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye936 personDessy Suciati