You don't have javascript enabled. Good luck with that.
Pencarian
 MRT Fase 2 akan Terintegrasi dengan Stasiun Kota
.
photo istimewa - Beritajakarta.id

MRT Phase 2 will Be Integrated with Kota Station

PT MRT Jakarta stated that the MRT phase 2 with route HI Roundabout (HI)-Kota will be integrated with Kota Station.

It will also be integrated with Kota Tua

"It will also be integrated with Kota Tua," expressed PT MRT Jakarta President Director, William Sabandar, Thursday (6/20).

MRT Phase 2 and Phase 1 Construction are Simultaneously

Even, there will be several stations that are historical and monumental in the Monas, Harmoni and Kota Tua areas.

"This phase 2 has 8.3 kilometers length with a distance of about 20 minutes from the HI Roundabout to Kota Tua," he told.

The next phase is planned to be made across the underground. Its depth is also made deeper than phase 1.

"Phase 2 is totally developed underground," he stated.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye397 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye353 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye325 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye317 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik