You don't have javascript enabled. Good luck with that.
Pencarian
 MRT Fase 2 akan Terintegrasi dengan Stasiun Kota

MRT Phase 2 will Be Integrated with Kota Station

PT MRT Jakarta stated that the MRT phase 2 with route HI Roundabout (HI)-Kota will be integrated with Kota Station.

It will also be integrated with Kota Tua

"It will also be integrated with Kota Tua," expressed PT MRT Jakarta President Director, William Sabandar, Thursday (6/20).

MRT Phase 2 and Phase 1 Construction are Simultaneously

Even, there will be several stations that are historical and monumental in the Monas, Harmoni and Kota Tua areas.

"This phase 2 has 8.3 kilometers length with a distance of about 20 minutes from the HI Roundabout to Kota Tua," he told.

The next phase is planned to be made across the underground. Its depth is also made deeper than phase 1.

"Phase 2 is totally developed underground," he stated.

Linked News
Popular News indeks
  1. Pramono Pushes to Complete Long-Delayed Pluit JLNT by March 2027

    access_time20-11-2026 remove_red_eye697 personDessy Suciati
  2. JAF 2026 Highlights Maritime Heritage and Coastal Architecture

    access_time21-11-2026 remove_red_eye682 personAnita Karyati
  3. Hosted in Sydney, Pramono Discusses Opening Australian Campuses in Jakarta

    access_time25-11-2026 remove_red_eye664 personDessy Suciati
  4. Jakarta Strengthens ASEAN Cooperation on Climate, Transport, and Youth

    access_time20-11-2026 remove_red_eye638 personFolmer
  5. BORJU Markets 200 Local Products

    access_time20-11-2026 remove_red_eye607 personAnita Karyati