You don't have javascript enabled. Good luck with that.
Pencarian
 MRT Fase 2 akan Terintegrasi dengan Stasiun Kota
.
photo istimewa - Beritajakarta.id

MRT Phase 2 will Be Integrated with Kota Station

PT MRT Jakarta stated that the MRT phase 2 with route HI Roundabout (HI)-Kota will be integrated with Kota Station.

It will also be integrated with Kota Tua

"It will also be integrated with Kota Tua," expressed PT MRT Jakarta President Director, William Sabandar, Thursday (6/20).

MRT Phase 2 and Phase 1 Construction are Simultaneously

Even, there will be several stations that are historical and monumental in the Monas, Harmoni and Kota Tua areas.

"This phase 2 has 8.3 kilometers length with a distance of about 20 minutes from the HI Roundabout to Kota Tua," he told.

The next phase is planned to be made across the underground. Its depth is also made deeper than phase 1.

"Phase 2 is totally developed underground," he stated.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1503 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye925 personAldi Geri Lumban Tobing
  3. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye392 personFolmer
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye389 personDessy Suciati
  5. 13 Inter-village Bridges in South Jakarta Revitalized

    access_time16-01-2025 remove_red_eye367 personTiyo Surya Sakti