You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Jalan Sambiloto di Kayu Putih Ditarget Rampung Pekan Ini

This Week, Collector Roads Repair in Kayu Putih Targeted to Finish

Repair on damaged collector roads at RW 01 and 06 of Kayu Putih Urban Village is targeted to finish this week. It is done to fulfill residents' request in planning and development discussion (Musrenbang) 2018.

Those collector roads are repaired simultaneously from the beginning until the end of this week

Pulogadung Bina Marga Unit Head, Irma Renta Tobing mentioned to focus on repairing Jalan Waringin 1 at RW 01, then Jalan Sambiloto and Jalan Lempuyang at RW 06 using hot mix asphalt to repair the road.

Bina Marga Repairs Concrete Curbs on Jalan Haji Murtado

"Those collector roads are repaired simultaneously from the beginning until the end of this week," he conveyed, Thursday (6/27).

Collector roads have similar width around 2.5-2.8 meters. The damaged area of Jl. Waringin 1 is 800 square meters, while damaged area on Jl. Sambiloto 1 until Jl. Lempuyang is around 1,500.56 square meters.

This repair is hoped to give more comfort to the road users and the locals.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye867 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye423 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye370 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye357 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye352 personAldi Geri Lumban Tobing
close