This Week, Collector Roads Repair in Kayu Putih Targeted to Finish
Reported by Nurito | Translated by Maria Inggita
Repair on damaged collector roads at RW 01 and 06 of Kayu Putih Urban Village is targeted to finish this week. It is done to fulfill residents' request in planning and development discussion (Musrenbang) 2018.
Those collector roads are repaired simultaneously from the beginning until the end of this week
Pulogadung Bina Marga Unit Head, Irma Renta Tobing mentioned to focus on repairing Jalan Waringin 1 at RW 01, then Jalan Sambiloto and Jalan Lempuyang at RW 06 using hot mix asphalt to repair the road.
Bina Marga Repairs Concrete Curbs on Jalan Haji Murtado"Those collector roads are repaired simultaneously from the beginning until the end of this week," he conveyed, Thursday (6/27).
Collector roads have similar width around 2.5-2.8 meters. The damaged area of Jl. Waringin 1 is 800 square meters, while damaged area on Jl. Sambiloto 1 until Jl. Lempuyang is around 1,500.56 square meters.
This repair is hoped to give more comfort to the road users and the locals.