You don't have javascript enabled. Good luck with that.
Pencarian
Sering Jebol, Tanggul Kali Caglak Butuh Perbaikan

Caglak River's Levee Needs Quick Fix

Citizens living in RT 03/RW 10 Cibubur Urban Village, Ciracas, East Jakarta, are requesting related units to immediately repair a levee of Caglak River which has repeatedly collapsed due to flood. This is because, the river water overflowed and cause flooding in residential areas during rainy season.

Currently, the damage's width has reached more than 10 meters. To prevent unwanted things, locals initiative to build a temporary levee using sand and bamboo

Mamat, (40), a citizen of RT 03/RW 10 expressed since April-July 2014, the levee was collapsed three times. Ironically, its damage is getting worse due to never repaired.

Channel and Levee Built on Jl. S Parman as Flood Prevention

"Currently, the damage's width has reached more than 10 meters. To prevent unwanted things, locals initiative to build a temporary levee using sand and bamboo," he told, Monday (9/1).

Vice Head of Ciracas Sub-District, Dicky Suherlan admitted that his side has received report from locals regarding such matter. "We have reported the case to the Water Management Public Works Sub-Department. Hopefully, the levee could be repaired soon," he expressed.

Head of Water Resources Maintenance Division for East Jakarta Water Management Public Works Sub-Department, Ahmad Yazid Bustomi disclosed his sub-department will ask Ciracas Sub-District to check the levee in the field. "Afterwards, we will do repair," he uttered.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1700 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1476 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1333 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1117 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye810 personDessy Suciati