You don't have javascript enabled. Good luck with that.
Pencarian
 Pengerjaan Turap di Kali Sentiong Kelurahan Paseban Mencapai 30 Persen
.
photo Agung Supriyanto - Beritajakarta.id

Sheet Pile Installation on Sentiong River Has Reached 23 Percent

The sheet pile installation progress on the Sentiong River, Paseban Urban Village, Senen, Central Jakarta has reached 23 percent. 

To do it, we have deployed 20 personnel to the location

Senen Sub-district Water Resources Executing Unit Head Rohman said it is carried out to strengthen the river wall structures in order to anticipate landslides.

Karang Bolong River Uses Old Tires as Sheet Pile Naturalization

"Its installation is carried out up to 310 meters and has been done about 70 meters," he expressed, Monday (9/30).

This work that has been ongoing since September 2 is targeted to be complete on October 27.

"To do it, we have deployed 20 personnel to the location," he stated.

As for the information, the sheet pile will have 2 meters height with a foundation of 60 centimeters width.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1043 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye908 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye552 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye448 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye386 personAldi Geri Lumban Tobing