You don't have javascript enabled. Good luck with that.
Pencarian
Proyek Jalan Inspeksi Kali Mookevart Digarap 4 Tahap
Pasca pe.
photo Yopie Oscar - Beritajakarta.id

Construction of Inspection Road at Mookevart River Conducted by 4 Stages

This is the first stage as long as two kilometers through four stages. Each stage takes two kilometers and will be done in a month and so o

Post-demolishment of houses on the banks of Mookevart River, RT 04/RW 02, Rawa Buaya Urban Village, Cengkareng Sub-District, West Jakarta, Wednesday (9/10) yesterday, the inspection road construction in such region can already begin.  

Coordinator of Jakarta River and Dam, Heryanto disclosed the project will be carried out in four stages and is targeted to be done at the end of this year. In details, the first stage is planned to be done in a month, where its construction started from Cengkareng Drain River Sluice Gate until Pasar Sentra Rawa Buaya, including citizen residential at RW 02.

Demolishment on the Banks of Mookevart River Colored by Chaos

"This is the first stage as long as two kilometers through four stages. Each stage takes two kilometers and will be done in a month and so on," he explained, Thursday (9/11).

The inspection road will be carried out in Jalan Daan Mogot, Cengkareng, untl border of Tangerang City is Batu Ceper. According to him, its construction is made as an alternative way of citizens to prevent traffic congestion on Jalan Daan Mogot. "The road inspection will be used as an alternative way to parse congestion on Jalan Daan Mogot," he added.

Head of Cengkareng Sub-District, Ali Maulana Hakim added inspection road construction is a follow-up of the Governor Instruction on inspection road that should be available throughout rivers and dams. It is done to maintain the rivers and dams in Jakarta. "The river should have inspection roads in order to add access road for locals to Jalan Daan Mogot, and improve people's economy," he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1037 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye903 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye545 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye447 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing