You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Waduk Daan Mogot Capai 50 Persen

December, Daan Mogot Reservoir Development Finished

The Daan Mogot Reservoir development in Duri Kosambi Urban Village, Cengkareng, West Jakarta has reached 50 percent.

I'm sure it will finish soon

"Yesterday I reviewed the location directly. After the work is done, it will continue with the establishment of the overall reservoir area," expressed Jakarta Water Resources Agency Head Juaini Yusuf, Thursday (11/7).

It will be one of the sources of raw water to meet the needs of clean water for the Pesakih Flat Tower citizens.

This Year, Daan Mogot Reservoir Developed

"This reservoir will be multifunctional. So, not only to minimize inundation or flooding," he explained.

It can also accommodate water from the effluents from the IPAL in each flat.

"After meeting the quality standards, the waste water flowed into the reservoir will be processed into clean water and then distributed to the flat units," he told.

He added it would also be a green open space (RTH) that is completed with jogging track facilities to a bridge that can be used for selfies.

"Surely they can interact with each other there," he uttered.

He is optimistic that the project developed with the naturalization concept with a budget by Rp 12 billion, will be completed in December.

"Its land is about 1.2 hectares, I'm sure it will finish soon," he stated.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1041 personFolmer
  2. Pramono Calls on Residents to Maintain Peace and Harmony During Ramadan

    access_time14-02-2026 remove_red_eye968 personFakhrizal Fakhri
  3. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye925 personNurito
  4. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye879 personAldi Geri Lumban Tobing
  5. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye782 personAldi Geri Lumban Tobing