You don't have javascript enabled. Good luck with that.
Pencarian
Komisi D DPRD Setujui Pembangunan Saringan Sampah di Kali Ciliwung

Commission D Approves Waste Filter Construction in Ciliwung River

The Jakarta DPRD Commission D, approved the proposed budget allocation for the construction of a waste filter in Ciliwung River amounting to Rp 197 billion filed by the Environment Department in a meeting on the 2020 budget priorities and preliminary threshold (KUA-PPAS), Monday (11/11).

It aims to prevent the flow of waste to the downstream

According to Andono Warih, Head of Jakarta Environment Department, his side gets assistance from the Bandung Institute of Technology (ITB) to draft the project design.

"It aims to prevent the flow of waste to the downstream. Moreover, during rainy season, piles of garbage could reach up to tenfold," he explained.

Commission D Approves Budget to Construct 10 Sluices in Central Jakarta

Eventually the filter will have three nets in order to accommodate large volumes of waste.

Jakarta DPRD Commission D Chairwoman Ida Mahmudah expressed that if the filter is effective, the department will be asked to install the same filter at a number of other points in the future.

"The point is we agree it to overcome piles of waste from the downstream," he stated.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye790 personTiyo Surya Sakti
  2. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye697 personDessy Suciati
  3. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye636 personTiyo Surya Sakti
  4. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye533 personNurito
  5. Gov Pramono: Jakarta Prepared to Adopt Weekly WFH Scheme

    access_time30-03-2026 remove_red_eye442 personDessy Suciati