You don't have javascript enabled. Good luck with that.
Pencarian
Komisi D DPRD Setujui Pembangunan Saringan Sampah di Kali Ciliwung
.
photo istimewa - Beritajakarta.id

Commission D Approves Waste Filter Construction in Ciliwung River

The Jakarta DPRD Commission D, approved the proposed budget allocation for the construction of a waste filter in Ciliwung River amounting to Rp 197 billion filed by the Environment Department in a meeting on the 2020 budget priorities and preliminary threshold (KUA-PPAS), Monday (11/11).

It aims to prevent the flow of waste to the downstream

According to Andono Warih, Head of Jakarta Environment Department, his side gets assistance from the Bandung Institute of Technology (ITB) to draft the project design.

"It aims to prevent the flow of waste to the downstream. Moreover, during rainy season, piles of garbage could reach up to tenfold," he explained.

Commission D Approves Budget to Construct 10 Sluices in Central Jakarta

Eventually the filter will have three nets in order to accommodate large volumes of waste.

Jakarta DPRD Commission D Chairwoman Ida Mahmudah expressed that if the filter is effective, the department will be asked to install the same filter at a number of other points in the future.

"The point is we agree it to overcome piles of waste from the downstream," he stated.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1506 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye929 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye428 personBudhi Firmansyah Surapati
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye410 personDessy Suciati
  5. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye398 personFolmer