You don't have javascript enabled. Good luck with that.
Pencarian
Penataan Kolong Tol Joglo dilengkapi Saung dan Tempat Sholat

Arrangement Under Joglo Toll Road Has Reached 90 Percent

The empty land arrangement under JORR W2 toll road, Jalan Joglo Raya, RW 01 and 08, Joglo, Kembangan, West Jakarta until now has reached 90 percent. The land was previously neglected and now it is in the greening and three-dimensional mural stage.

The park there will also be completed with a saung for Betawi specialty food sellers

There are four walls as long as 12 meters and 4 meters height under the toll road painted with an eagle-painted mural that characterizes the city of Jakarta, Transjakarta bus and Betawi traditional house.

"The park there will also be completed with a saung for Betawi specialty food sellers (PKK members) and karang taruna activities," expressed Joglo Urban Village Head, Matrullah, at the location, Tuesday (11/12).

90 Percent Arrangement Work Under Toll and Non-Toll Flyovers Completed

Aside that, this location that is able to accommodate 120 motorcycles also has a mushola (prayer room), an ablution place, a bench and children's swing and so on.

As for the information, the arrangement is realized through the Corporate Social Responsibility (CSR) and the community. It will be complete by the end of this month.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1576 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1436 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1301 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1094 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye965 personDessy Suciati