You don't have javascript enabled. Good luck with that.
Pencarian
Penataan Kolong Tol Joglo dilengkapi Saung dan Tempat Sholat

Arrangement Under Joglo Toll Road Has Reached 90 Percent

The empty land arrangement under JORR W2 toll road, Jalan Joglo Raya, RW 01 and 08, Joglo, Kembangan, West Jakarta until now has reached 90 percent. The land was previously neglected and now it is in the greening and three-dimensional mural stage.

The park there will also be completed with a saung for Betawi specialty food sellers

There are four walls as long as 12 meters and 4 meters height under the toll road painted with an eagle-painted mural that characterizes the city of Jakarta, Transjakarta bus and Betawi traditional house.

"The park there will also be completed with a saung for Betawi specialty food sellers (PKK members) and karang taruna activities," expressed Joglo Urban Village Head, Matrullah, at the location, Tuesday (11/12).

90 Percent Arrangement Work Under Toll and Non-Toll Flyovers Completed

Aside that, this location that is able to accommodate 120 motorcycles also has a mushola (prayer room), an ablution place, a bench and children's swing and so on.

As for the information, the arrangement is realized through the Corporate Social Responsibility (CSR) and the community. It will be complete by the end of this month.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye385 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
close