You don't have javascript enabled. Good luck with that.
Pencarian
Crossing Saluran Yang Roboh di Jl. Ciragil Timur Berhasil Ditangani

Crossing Channel Repair on Jalan Ciragil Timur Completed

South Jakarta Bina Marga Sub-department personnel have finished repairing collapsed crossing channel (sodetan) on Jalan Ciragil Timur, Rawa Barat Urban Village, Kebayoran Baru.

Alhamdulillah we can finish it less than a week

South Jakarta Bina Marga Sub-department's Road and Bridge Section Head, Ujang Royani mentioned, his side deployed 15 personnel routinely to repair the crossing channel.

"We received the report from the locals on Sunday through CRM application as well as report from Rawa Barat Urban Village office. Immediately, we surveyed the location and casted the crossing channel," he explained, Thursday (1/23).

Construction of Crossing Channel in Sukapura Completed

According to him, it takes 3 days to repair it. During the repair, Jalan Ciragil Timur access was closed to accelerate the work.

"Today we open the road at 1 PM. Because we have finished the repair," he conveyed.

For information, this crossing channel was collapsed with depth 1.5 meters, legth 2 meters, and width 60 centimeters.  

"Alhamdulillah we can finish it less than a week. Later, we just need to pave the road," he closed.

Linked News
Popular News indeks
  1. Jakarta Council Begins Deliberations on New Population and Housing Bylaws

    access_time21-08-2026 remove_red_eye1691 personFakhrizal Fakhri
  2. Jakarta Assesses Needs and Coordinates Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye733 personAldi Geri Lumban Tobing
  3. Pramono: Independence must Be Manifested Through Concrete Action

    access_time17-08-2026 remove_red_eye684 personDessy Suciati
  4. Jakarta Prepares Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye683 personDessy Suciati
  5. Pramono Commends Madurese Community for Their Vital Role in Building Jakarta

    access_time19-08-2026 remove_red_eye654 personDessy Suciati