You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Buis Beton Untuk Sumur Resapan Dipercepat

Buis Concrete Making for Absorption Wells in South Jakarta is Accelerated

The South Jakarta Water Resources Sub-agency is speeding up making buis concrete for absorption well material. The plan is to build 100 wells this year in South Jakarta.

This month, we target to build 800 units

To achieve that target, there must be 6,500 pieces of buis concrete. Its making is processed in Rawa Minyak Building, Jalan AUP, RT06/10, Pasar Minggu Urban Village.

"This month, we target to build 800 units," expressed South Jakarta Water Resources (SDA) Sub-agency Head, Mustajab, Tuesday (2/4).

City Collaborates with Locals to Build Vertical Drainage

He explained buis concrete has 80 cm diameter and 100 cm height. Later on, the worker would be divided into three shifts.

"There are 30 workers to make the concrete. Hopefully all can run well thus we can realize well project in each corner of the location," he stated.

As for the information, absorption well is very useful during the rainy season to reduce the risk of inundation, absorb rainwater to enter the ground, as a container before flowing into waterways and to prevent drought disaster.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5515 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4649 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1855 personTiyo Surya Sakti
  4. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye851 personAldi Geri Lumban Tobing
  5. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye744 personAldi Geri Lumban Tobing