You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Buis Beton Untuk Sumur Resapan Dipercepat

Buis Concrete Making for Absorption Wells in South Jakarta is Accelerated

The South Jakarta Water Resources Sub-agency is speeding up making buis concrete for absorption well material. The plan is to build 100 wells this year in South Jakarta.

This month, we target to build 800 units

To achieve that target, there must be 6,500 pieces of buis concrete. Its making is processed in Rawa Minyak Building, Jalan AUP, RT06/10, Pasar Minggu Urban Village.

"This month, we target to build 800 units," expressed South Jakarta Water Resources (SDA) Sub-agency Head, Mustajab, Tuesday (2/4).

City Collaborates with Locals to Build Vertical Drainage

He explained buis concrete has 80 cm diameter and 100 cm height. Later on, the worker would be divided into three shifts.

"There are 30 workers to make the concrete. Hopefully all can run well thus we can realize well project in each corner of the location," he stated.

As for the information, absorption well is very useful during the rainy season to reduce the risk of inundation, absorb rainwater to enter the ground, as a container before flowing into waterways and to prevent drought disaster.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye730 personFakhrizal Fakhri
  2. Jakarta Regional Budget Spending Reaches Rp10.38 Trillion in Q1

    access_time17-04-2026 remove_red_eye689 personDessy Suciati
  3. Job Absorption Rises in Jakarta

    access_time17-04-2026 remove_red_eye587 personDessy Suciati
  4. Training and Certification Boost Tourism Workforce Competitiveness

    access_time17-04-2026 remove_red_eye568 personAldi Geri Lumban Tobing
  5. Pramono: Jakarta's Gini Ratio Drops to 0.423

    access_time17-04-2026 remove_red_eye511 personDessy Suciati