You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Buis Beton Untuk Sumur Resapan Dipercepat

Buis Concrete Making for Absorption Wells in South Jakarta is Accelerated

The South Jakarta Water Resources Sub-agency is speeding up making buis concrete for absorption well material. The plan is to build 100 wells this year in South Jakarta.

This month, we target to build 800 units

To achieve that target, there must be 6,500 pieces of buis concrete. Its making is processed in Rawa Minyak Building, Jalan AUP, RT06/10, Pasar Minggu Urban Village.

"This month, we target to build 800 units," expressed South Jakarta Water Resources (SDA) Sub-agency Head, Mustajab, Tuesday (2/4).

City Collaborates with Locals to Build Vertical Drainage

He explained buis concrete has 80 cm diameter and 100 cm height. Later on, the worker would be divided into three shifts.

"There are 30 workers to make the concrete. Hopefully all can run well thus we can realize well project in each corner of the location," he stated.

As for the information, absorption well is very useful during the rainy season to reduce the risk of inundation, absorb rainwater to enter the ground, as a container before flowing into waterways and to prevent drought disaster.

Linked News
Popular News indeks
  1. 21 Parking Spots to Make Your Jakarta 499th Anniversary Experience Seamless

    access_time26-06-2026 remove_red_eye883 personAldi Geri Lumban Tobing
  2. Over 11 Kilometers of Overhead Utility Cables Removed in West Jakarta

    access_time26-06-2026 remove_red_eye850 personBudhi Firmansyah Surapati
  3. Celebrating Jakarta`s 499th Anniversary at HI, Please Use Public Transportation

    access_time26-06-2026 remove_red_eye730 personAldi Geri Lumban Tobing
  4. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye661 personDessy Suciati
  5. 190 Satpol PP Personnel Deployed to Secure Jakarta Anniversary Celebration

    access_time26-06-2026 remove_red_eye657 personFolmer