You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Buis Beton Untuk Sumur Resapan Dipercepat

Buis Concrete Making for Absorption Wells in South Jakarta is Accelerated

The South Jakarta Water Resources Sub-agency is speeding up making buis concrete for absorption well material. The plan is to build 100 wells this year in South Jakarta.

This month, we target to build 800 units

To achieve that target, there must be 6,500 pieces of buis concrete. Its making is processed in Rawa Minyak Building, Jalan AUP, RT06/10, Pasar Minggu Urban Village.

"This month, we target to build 800 units," expressed South Jakarta Water Resources (SDA) Sub-agency Head, Mustajab, Tuesday (2/4).

City Collaborates with Locals to Build Vertical Drainage

He explained buis concrete has 80 cm diameter and 100 cm height. Later on, the worker would be divided into three shifts.

"There are 30 workers to make the concrete. Hopefully all can run well thus we can realize well project in each corner of the location," he stated.

As for the information, absorption well is very useful during the rainy season to reduce the risk of inundation, absorb rainwater to enter the ground, as a container before flowing into waterways and to prevent drought disaster.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye835 personTiyo Surya Sakti
  2. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye768 personNurito
  3. Posyandu-Posbindu Services Reach 1,600 Seniors and Toddlers in Utan Panjang

    access_time07-04-2026 remove_red_eye748 personFolmer
  4. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye674 personTiyo Surya Sakti
  5. West Jakarta BPN Holds Mobile Land Service in Kembangan

    access_time06-04-2026 remove_red_eye618 personBudhi Firmansyah Surapati