You don't have javascript enabled. Good luck with that.
Pencarian
 Petugas SDA membangun Tanggul Penahan Abrasi Pulau Karya

Seawall Construction on Karya Island Has Touched 90 Percent

We have sent eight workers to finish it

The construction of a seawall (called outer sea dike) on the north and east sides of Karya Island, Panggang Island Urban Village has touched more than 90 percent and is targeted to be complete by the end of this month.

"We have sent eight workers to finish it," expressed Thousand Islands Water Resources Sub-agency Head, Abdul Rauf, Tuesday (3/24).

This Week, Elevation of Rawa Badak Utara River’s Dike Finished

Specifically for the north side, the seawall is made up to 55 meters long with 1.30 meters wide and 80 centimeters high. While the east side has 57.80 meters long with 1.30 meters wide and 80 centimeters high.

"We make it to reduce land subsidence on Karya Island due to waves," he hoped.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye820 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye674 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye595 personAldi Geri Lumban Tobing
  4. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye529 personDessy Suciati
  5. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye516 personAnita Karyati