You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan Proyek Jalanan dan Drainase PIBC Capai 65 Persen

Process of Road Repairing and Drainage Building at PIBC Reaches 65 Percent

Construction work for repairing road and building drainage at Cipinang Rice Central Market (PIBC) has reached 65 percent. It is targeted to finish in October 2020.

By repairing drainage system, we hope there is no inundation in PIBC area

"As of today, its process has reached 65 percent. We started the construction since February 2020," conveyed Arief Prasetyo Adi, President Director of PT. Food Station Tjipinang Jaya, Monday (8/10).

According to him, as long as 45,801.57 square meters road should be repaired because heavy tonnage vehicles cross the road every day. While his side also builds drainage as long as 6,347.48 square meters and retention wells to repair the drainage system thus it can prevent inundation in PIBC area.

PIBC Management Intensifies Socialization About Face Mask Use

"By repairing drainage system, we hope there is no inundation in PIBC area, especially when heavy rain falls. Thus the road condition can be maintained well," he added.

He informed that road repairing as well as drainage and retention well building is a part of PIBC revitalization project which carried out gradually by PT. Food Station Tjipinang Jaya in the last three years.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1295 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1126 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye289 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye285 personAldi Geri Lumban Tobing