Channel Along Jalan Minangkabau Dredged to Minimize Inundation
access_time September 25 2020 10:46 PM remove_red_eye 1047
Reported by TP Moan Simanjuntak | Translated by Maria Inggita
Reported by TP Moan Simanjuntak | Translated by Maria Inggita
South Jakarta Water Resources (SDA) dredged water channel along Jalan Minangkabau Barat, Pasar Manggis Urban Village, Setiabudi.
It is full of mud and garbage thus when the rain falls, water can't flow into the channel
Setiabudi SDA Unit Head, Agus Bowo Leksono mentioned, this channel has width 1 meter with length around 395 meters. His side dredged the channel around 1 meter depth to increase its capacity.
"It is full of mud and garbage thus when the rain falls, water can't flow into the channel," he said, Friday (9/25).
Connecting Channel in Cipinang Melayu RepairedHis side deployed 8 PJLP personnel to dredge the channel since September 17 and targeted to finish within a month.
Until this day, his side has dredged channel around 110 meters long.
"Hopefully this dredging can minimize inundation on the road," he conveyed.