You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Kuras Saluran di Jalan Minangkabau Barat

Channel Along Jalan Minangkabau Dredged to Minimize Inundation

South Jakarta Water Resources (SDA) dredged water channel along Jalan Minangkabau Barat, Pasar Manggis Urban Village, Setiabudi.

It is full of mud and garbage thus when the rain falls, water can't flow into the channel

Setiabudi SDA Unit Head, Agus Bowo Leksono mentioned, this channel has width 1 meter with length around 395 meters. His side dredged the channel around 1 meter depth to increase its capacity.

"It is full of mud and garbage thus when the rain falls, water can't flow into the channel," he said, Friday (9/25).

Connecting Channel in Cipinang Melayu Repaired

His side deployed 8 PJLP personnel to dredge the channel since September 17 and targeted to finish within a month.

Until this day, his side has dredged channel around 110 meters long.

"Hopefully this dredging can minimize inundation on the road," he conveyed.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1408 personFolmer
  2. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye847 personAldi Geri Lumban Tobing
  3. Commemorating Vesak, Jakarta Lights Up with Illumination of Jakarta 2026

    access_time30-05-2026 remove_red_eye648 personBudhi Firmansyah Surapati
  4. Seniors Participate in Pasti Bisa Berkarya at MRT Stations

    access_time02-06-2026 remove_red_eye596 personAldi Geri Lumban Tobing
  5. Krendang Fire Victims Receive Proper Support and Assistance

    access_time29-05-2026 remove_red_eye470 personBudhi Firmansyah Surapati