You don't have javascript enabled. Good luck with that.
Pencarian
SDBM Jakpus Perbaiki Ratusan Titik Tali dan Mulut Air

826 Gutters in Central Jakarta have Been Repaired

32 out of 61 points of storm inlet in eight sub-district have been completed

The Central Jakarta Bina Marga Sub-agency Head Raki, Sastranegara has noted that as many as 826 gutters have been repaired in eight sub-districts, during January until October.

His sub-agency was also focusing on the accelerated work of the storm inlet or holes for drains.

Gutters Alongside Jalan Darmawangsa Cleaned

"32 out of 61 points of storm inlet in eight sub-district have been completed. Then the rest of 91 points are being accelerated to be complete in December," he told, Thursday (11/12).

Even the agency had followed up complaints from residents regarding the repair of potholes.

"Every time there is a complaint we always involve PJLPs," he closed.

Linked News
Popular News indeks
  1. Indonesia-Singapore Match: 80 Dishub Personnel Deployed to Manage Traffic Around GBK

    access_time25-09-2026 remove_red_eye586 personAldi Geri Lumban Tobing
  2. Jakarta International Stadium Sets Up Transit Schemes for The Weeknd Concert

    access_time24-09-2026 remove_red_eye472 personAldi Geri Lumban Tobing
  3. Jakarta Calls on Residents to Save Energy with 60-Minute Lights-Off Action

    access_time19-09-2026 remove_red_eye432 personAldi Geri Lumban Tobing
  4. South Jakarta BPBD Distributes 44,000 Liters of Clean Water

    access_time19-09-2026 remove_red_eye370 personTiyo Surya Sakti
  5. Jakarta Inspectorate Partners with KPK to Foster Early Anti-Corruption Culture

    access_time20-09-2026 remove_red_eye321 personFolmer