You don't have javascript enabled. Good luck with that.
Pencarian
SDBM Jakpus Perbaiki Ratusan Titik Tali dan Mulut Air

826 Gutters in Central Jakarta have Been Repaired

32 out of 61 points of storm inlet in eight sub-district have been completed

The Central Jakarta Bina Marga Sub-agency Head Raki, Sastranegara has noted that as many as 826 gutters have been repaired in eight sub-districts, during January until October.

His sub-agency was also focusing on the accelerated work of the storm inlet or holes for drains.

Gutters Alongside Jalan Darmawangsa Cleaned

"32 out of 61 points of storm inlet in eight sub-district have been completed. Then the rest of 91 points are being accelerated to be complete in December," he told, Thursday (11/12).

Even the agency had followed up complaints from residents regarding the repair of potholes.

"Every time there is a complaint we always involve PJLPs," he closed.

Linked News
Popular News indeks
  1. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye599 personAldi Geri Lumban Tobing
  2. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye562 personAldi Geri Lumban Tobing
  3. Pramono Confirms Permanent Bridge to Be Built in Tegal Alur

    access_time29-08-2026 remove_red_eye460 personDessy Suciati
  4. Jakarta Fine Arts and Ceramics Museum Hosts Malangan Exhibition

    access_time29-08-2026 remove_red_eye457 personFakhrizal Fakhri
  5. Pramono Emphasizes Importance of Creative Spaces for Children

    access_time03-09-2026 remove_red_eye434 personDessy Suciati