You don't have javascript enabled. Good luck with that.
Pencarian
 Pengerukan Lumpur Setu Babakan Sudah Capai 80 Persen
.
photo TP Moan Simanjuntak - Beritajakarta.id

Mud Dredging Work in Setu Babakan Touched 80 Percent

Process of mud dredging work which carried out since July 2020 in Setu Babakan Lake, Srengseng Sawah, Jagakarsa, South Jakarta now has reached about 80 percent.

We dredge it to depth of 2 meters

South Jakarta Water Resources (SDA) Sub-agency, Mustajab conveyed, there was siltation in this 34-hectare lake. In order to optimize its capacity in rainy season, his side normalized it by dredging mud sedimentation from the lake.

"We dredge it to depth of 2 meters," he stated, Saturday (11/28).

SDA Uses Watermaster to Dredge Mud Sedimentation in Ria Rio Reservoir

In this dredging, his side deployed 5 heavy equipment on the south side. This work was estimated to finish in December.

"After being dredged, its capacity can be optimal thus it can reduce number of inundated locations in the region," he said.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye560 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye455 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye310 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye303 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye297 personTiyo Surya Sakti