You don't have javascript enabled. Good luck with that.
Pencarian
 Pengerukan Lumpur Setu Babakan Sudah Capai 80 Persen

Mud Dredging Work in Setu Babakan Touched 80 Percent

Process of mud dredging work which carried out since July 2020 in Setu Babakan Lake, Srengseng Sawah, Jagakarsa, South Jakarta now has reached about 80 percent.

We dredge it to depth of 2 meters

South Jakarta Water Resources (SDA) Sub-agency, Mustajab conveyed, there was siltation in this 34-hectare lake. In order to optimize its capacity in rainy season, his side normalized it by dredging mud sedimentation from the lake.

"We dredge it to depth of 2 meters," he stated, Saturday (11/28).

SDA Uses Watermaster to Dredge Mud Sedimentation in Ria Rio Reservoir

In this dredging, his side deployed 5 heavy equipment on the south side. This work was estimated to finish in December.

"After being dredged, its capacity can be optimal thus it can reduce number of inundated locations in the region," he said.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1080 personFolmer
  2. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye466 personAldi Geri Lumban Tobing
  3. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye464 personBudhi Firmansyah Surapati
  4. Setu Babakan Presents Arts and Culture Extravaganza to Mark Jakarta Anniversary

    access_time20-06-2026 remove_red_eye433 personNurito
  5. Jakarta Light Festival Dazzles Visitors at Kota Tua

    access_time22-06-2026 remove_red_eye418 personBudhi Firmansyah Surapati