You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Longsor di Jl Bunga Dalam Rampung

Collapsed Sheet Pile Repair on Jalan Bunga Dalam Completed

This sheet pile has 10 meters length, 25 centimeters width and 1.5 meters height

The collapsed sheet pile repair work on Jalan Bunga Dalam II, RW 09, Palmerian, Matraman, East Jakarta has finally done, on Sunday (12/13).

Matraman Sub-district Water Resources (SDA) Executing Unit Head Erland Sianipar expressed, its repair was conducted for approximately ten days by deploying 15 personnel of the Mataraman Sub-district SDA Task Force.

Collapsed Sheet Pile on Jalan Asem Gede Utara Being Repaired

"This sheet pile has 10 meters length, 25 centimeters width and 1.5 meters height," he expressed, Sunday (12/13).

Hopefully it could maximally accommodate water thus the water flows smoothly," he stated.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye1615 personBudhi Firmansyah Surapati
  2. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye806 personBudhi Firmansyah Surapati
  3. Jakarta Provincial Government Anticipates the Impact of Volcanic Ash from Mount Anak Krakatau

    access_time06-09-2026 remove_red_eye666 personFolmer
  4. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye606 personFakhrizal Fakhri
  5. Jakarta BPBD Urges Residents to Prepare for Meteorological Drought

    access_time04-09-2026 remove_red_eye572 personAldi Geri Lumban Tobing