You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Jl Raya Cakung Cilincing di Semper Timur Dikuras

Channel Dredging Carried Out on Jl. Raya Cakung Cilincing

Channel dredging which carried out on Jl. Raya Cakung Cilincing (Cacing) RW 11 Semper Timur Urban Village, Cilincing Sub-district, North Jakarta is targeted to finish this week.

We deploy 6 PPSU personnel every day to dredge it

This dredging work is done to overcome inundation that often occur when the heavy rain falls.

Semper Timur Urban Village Head, Cahyo Hudoyo conveyed, channel dredging work has been carried out since Monday (12/14) and targeted to finish in 1-2 days.

Crossing Channel Under Kebon Jeruk Toll Road has Been Dredged

"We deploy 6 PPSU personnel every day to dredge it," he informed, Thursday (12/17).

This channel has width and height about 60x80 centimeters. While his side dredged about 200 meters of the channel.

"Mud sedimentation thickness varies between 30-40 centimeters. It often causes inundation when it rains," he mentioned.

Linked News
Popular News indeks
  1. Hosted in Sydney, Pramono Discusses Opening Australian Campuses in Jakarta

    access_time25-11-2026 remove_red_eye825 personDessy Suciati
  2. Transjakarta Extends Operating Hours for MCR Concert at JIS

    access_time22-11-2026 remove_red_eye679 personAldi Geri Lumban Tobing
  3. Pasar Baru Festival 2026 Brings Historic District to Life

    access_time27-11-2026 remove_red_eye568 personFolmer
  4. Meet Boan, A Retired Teacher Crafting Traditional Betawi Masks

    access_time22-11-2026 remove_red_eye499 personNurito
  5. Jakarta Tops Teqball at 2026 PON Beach Games

    access_time27-11-2026 remove_red_eye499 personAldi Geri Lumban Tobing