Inundation on Jalan Bungur Gradually Receding from Afternoon
Reported by Folmer | Translated by Maria Inggita
Inundation on Jalan Bungur Raya, Kemayoran which located in front of Central Jakarta District Court Building gradually receded from afternoon.
Mobile pump with capacity 150 liters per second is deployed to drain the flood water on Jalan Bungur
Kemayoran Sub-district Water Resources (SDA) Task Force Head, Supriyadi mentioned, the location was flooded as high as 20 centimeters from morning due to overflowing Ciliwung Lama River.
His side handled the inundation by dredging mud from Ciliwung River and installing mobile pumps on the flooded road.
Inundation in Cipinang Melayu has Receded"Mobile pump with capacity 150 liters per second is deployed to drain the flood water on Jalan Bungur," he said, Tuesday (2/16).
For long-term solution, his side will install stationary pump with capacity 500 liters per second on Jalan Bungur Raya, as was done on Jalan Mangga Dua.
His side also proposed to build sluice gates from in front of Golden Truly building until Senen.
"Flood problem on Jalan Bungur Raya could be solved if pump and sluice gates installation is realized," he stated.