You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Saluran di Jalan Pasar Baru Timur Dilanjutkan

Drainage Construction on Jalan Pasar Baru Timur Continued

Central Jakarta Water Resources (SDA) Sub-agency continues water channel construction work on Jalan Pasar Baru Timur, Pasar Baru Urban Village, Sawah Besar.

We are targeting to complete channel on Jalan Pasar Baru Timur in April

Central Jakarta SDA Sub-agency's Drainage Channel Maintenance Section Head, Glen Santista mentioned, construction of 400-meter water channel is expected to minimize inundation on Jalan Pasar Baru area which often occurs during heavy rain.

"This construction work is the continuation from program in 2020 which is considered successful in overcoming inundation in the region," he added, Wednesday (3/3).

Damaged Gutters in Kota Tua Area Being Repaired

Last year, his side built 500-meter channel with depth of 1 meters on Jalan Pasar Baru Timur. This channel was built to hold rainwater and flow it into stilling basin.

"Water in stilling basin will be drained using pump to Ciliwung River," he informed.

His side has coordinated with City Park and Forestry Sub-agency to take care of trees affected by channel construction.

"We are targeting to complete channel on Jalan Pasar Baru Timur in April," he closed.

Linked News
Popular News indeks
  1. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2375 personTiyo Surya Sakti
  2. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye1002 personAldi Geri Lumban Tobing
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye986 personFolmer
  4. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye851 personFakhrizal Fakhri
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye745 personBudhi Firmansyah Surapati