Saturday, March 20th 2021 Reporter: Suparni Translator: Maria Inggita 1296
(Foto: Suparni)
Thousand Islands Water Resources (SDA) Sub-agency has completed the construction of three infiltration wells at SDN Pulau Harapan 01 Pagi, RT 04/02, Harapan Island Urban Village, North Thousand Islands Sub-district.
We deploy 4 personnel to build infiltration wells from March 15 to March 19
Thousand Islands SDA Sub-agency Head, Abdul Rouf stated, infiltration wells were built to prevent inundation in school area.
"We deploy 4 personnel to build infiltration wells from March 15 to March 19," he informed, Saturday (3/20).
He explained that each infiltration wells have length 80 centimeters, width 65 centimeters and depth 70 centimeters.
"Each infiltration wells are given distance of 10 meters which connected using pipe. By building infiltration wells, we hope SDN Pulau Harapan 01 Pagi area is no longer inundated," he said.