You don't have javascript enabled. Good luck with that.
Pencarian
112 Meter Turap Rusak di Kali Duri Diperbaiki

Duri River Sheet Pile Repair Progress on Jl. Padamulya Touches 70 Percent

West Jakarta Water Resources (SDA) Sub-agency is repairing Duri River's sheet pile on Jl. Padamulya, Tambora. This repair has been progressed up to 70 percent.

We are targeting this repair to finish in the next two weeks

West Jakarta SDA Sub-agency's Drainage Maintenance Section Head, Wawan Kurniawan stated, repair work had been carried out since Friday (7/2). According to him, damage on sheet pile is due to age factor that makes the river becomes not optimal in holding water, especially when heavy rain falls.

"We repair damaged sheet pile along 700 meters," he conveyed, Monday (7/12).

Breakwater in North Side of Kelapa Island Repaired

For this repair, his side deployed 20 personnel and equipped them with crowbars, hammers, buckets, cement spoons, saws, machetes, portable pumps and others. They repair the sheet pile by installing 500 dolken logs.

"We are targeting this repair to finish in the next two weeks," he mentioned.

After repairing sheet pile, he expected the river could be more optimal in holding water, better in aesthetic, and stronger.

"We also remind residents for not littering to the channel," he closed.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1708 personDessy Suciati
  2. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye703 personFakhrizal Fakhri
  3. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye461 personDessy Suciati
  4. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye442 personDessy Suciati
  5. No Damage Reported Following Magnitude 5.9 Seribu Islands Quake

    access_time12-09-2026 remove_red_eye434 personBudhi Firmansyah Surapati