Dukuh Atas 2 Bus Stop Resumes Operation with New Face
Reported by Aldi Geri Lumban Tobing | Translated by Nugroho Adibrata
The Dukuh Atas 2 Transjakarta bus stop located in South Jakarta has been resumed operations since Saturday (5/20).
Hopefully, this operation can further facilitate community mobility
PT Transjakarta Secretary Division Head, Apriastini Bakti Bugiansri said the Dukuh Atas 2 Bus Stop was temporarily closed on December 4, 2019 due to the construction of Jabodebek LRT (Light Rail Transit) station.
"Now customers can do activities and return to using the Dukuh Atas 2 Bus Stop with a new face carrying the open air concept," shd expressed, Monday (5/22).
Transjakarta Trials Ragunan - Kuningan Timur Travel Time 35 MinutesAs for the information, Dukuh Atas 2 Bus Stop serves corridor 4 with Pulogadung 2 - Dukuh Atas 2 route, Corridor 6 with Ragunan - Dukuh Atas 2 route, route 6Q Dukuh Atas - Kasablanka via Epicentrum, and route M4 Pulogadung 2 - Dukuh Atas 2 AMARI (Night Buses).
The Dukuh Atas 2 bus stop is completed with a prayer room, disabled toilets, and public toilets, CCTV cameras, and access to a crossing bridge (JPO) to Dukuh Atas 1 Bus Stop.
"Dukuh Atas 2 Bus Stop is also connected to the iconic Dukuh Atas 1 Bus Stop. Hopefully, this operation can further facilitate community mobility," she hoped.