You don't have javascript enabled. Good luck with that.
Pencarian
Dinas SDA Lakukan Pembangunan Waduk Marunda Tahap III

Rp 55 B Prepared for Construction of Marunda Reservoir Phase III

The Jakarta Water Resources Agency (SDA) is about to execute further construction of the Marunda Reservoir (Phase III) on the coast of Jakarta.

We plan to build a 39-hectare-wide reservoir to overcome flooding in this area

Its construction aims to overcome flooding in the Marunda Polder area with a catchment area as wide as 2,882 hectares.

SDA Agency's Data and Information Center (Pusdatin) Head, Nugraharyadi said the scope of work for the construction of the Marunda Reservoir Phase III included construction work on a reservoir embankment of approximately 765 meters and landscaping of Zones 2A and 2B covering a 3.9-hectare-wide land.

City Prepares Centralized Domestic Wastewater Management System

"We plan to build a 39-hectare-wide reservoir to overcome flooding in this area, including area arrangement for public and green open spaces covering an area of 26 hectares," he expressed, Wednesday (1/17).

He added the Marunda Reservoir construction would then await land acquisition, which was currently in the process of extending the location determination.

"To realize it, we'll spend a budget amounting to Rp 55 billion," he stated.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Routes Amid Demonstrations

    access_time28-10-2026 remove_red_eye581 personAldi Geri Lumban Tobing
  2. Central Jakarta Helps 879 Residents Retrieve Withheld Diplomas

    access_time30-10-2026 remove_red_eye548 personFolmer
  3. Jakarta to Host World Cities Culture Summit 2027

    access_time31-10-2026 remove_red_eye548 personBudhi Firmansyah Surapati
  4. Tourism Industry Workforce Capacity Continues to Be Improved

    access_time30-10-2026 remove_red_eye545 personAldi Geri Lumban Tobing
  5. Free Health Checks and TB Screening Held at RPTRA Tamplas Bambu

    access_time30-10-2026 remove_red_eye538 personNurito