You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan Saluran di Jalan Pinang Kalijati Ditargetkan Rampung Pekan Ini
.
photo Tiyo Surya Sakti - Beritajakarta.id

Water Channel on Jalan Pinang Kalijati Revitalized

Cilandak Sub-district's Water Resource Implementer Unit (Satpel SDA) is revitalizing water channel on Jalan Pinang Kalijati, RT 11/09, Pondok Labu, Cilandak Sub-district, South Jakarta. The project is targeted to complete next week.

The 60 cm U-ditch is installed on the channel

Yansori, Satpel Head, said water channel revitalization is conducted based on resident's request in Musrenbang 2023.

Dirty Channel on Jalan Raya Ragunan Cleaned from Mud and Waste

"The 60 cm U-ditch is installed on the channel," he said, Tuesday (1/23).

Yansori added that six personnel are deployed to revitalize the 100 meter channel.

"We also deployed excavator to speed up to work that has been started since January 18 ago," he added.

He hoped the revitalization can be completed on time in order to prevent inundation or flood during rainy season.

"U-ditch will add the channel capacity," he stated.

Meanwhile, Candra (33) local resident, also hoped the revitalization will eliminate inundation in the area.

"Thanks to the personnel for responding our request quickly. It is hoped the channel will function maximally," he said.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye560 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye455 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye310 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye303 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye297 personTiyo Surya Sakti