You don't have javascript enabled. Good luck with that.
Pencarian
Jajaran Sudin LH Jaksel Tinjau Pembangunan TPS 3R Jagakarsa

Lenteng Agung 3R Dump Site Construction Reaches 25 Percent

The construction of Reduce-Reuse-Recycle (3R) Dump Site on Jalan Joe, Lenteng Agung Urban Village, Jagakarsa Sub-district, South Jakarta has reached 25 percent. The construction was started in December 2023.

able to manage 30-40 tons of waste

Head Section of Community Participant for South Jakarta Environment Sub-agency, Aditya Pamungkas, said the construction is cooperated with private sides such as Nestle and World Wide Fund for Nature (WWF).

Heru Launches 3R Waste Management in Ciracas and Rawasari

"The cooperation with other sides is good to invite community to participate in utilizing waste," he said, Monday (1/29).

He added that the construction of 1,800 square meter dump site is targeted to complete in April.

"The dump site will be able to manage 30-40 tons of waste," he added.

According to him, the waste will be sorted and chopped to get same result with Refuse Derived Fuel (RDF) Bantar Gebang. Then it can be bought by cement factory as fuel.

"I appeal the residents to sort the waste before sending it to the dump site," he closed.

Linked News
Popular News indeks
  1. Still Rp 3,500! No Fare Change for Transjakarta’s Kalideres–Soetta Route

    access_time01-08-2026 remove_red_eye553 personAldi Geri Lumban Tobing
  2. Jakarta Reaffirms Commitment to Preserving Cultural Heritage

    access_time31-07-2026 remove_red_eye528 personDessy Suciati
  3. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye524 personTiyo Surya Sakti
  4. East Jakarta Repairs Fire Hydrants Damaged by Component Theft

    access_time31-07-2026 remove_red_eye466 personNurito
  5. Rano Karno Hopes Penjaringan Inspires a Citywide Quranic Movement

    access_time31-07-2026 remove_red_eye417 personBudhi Firmansyah Surapati